6/7/2004 |
|
|
Federal Register Volume 69 Number 109 |
PDF |
|
7/21/2004 |
Spencer Abraham |
John T. Conway |
DOE Accepts Board Recommendation 2004-1, Oversight of Complex, High-Hazard Nuclear Operations |
PDF |
|
7/21/2004 |
Spencer Abraham |
Kyle McSlarrow |
DOE Delelgation of Authority on Defense Nuclear Facility Matters to Field Offices |
PDF |
|
10/25/2004 |
Spencer Abraham |
John T. Conway |
DOE Requires up to an Additional 45 Days to Finalize and Transmit Implementation Plan for Board Recommendation 2004-1 |
PDF |
|
10/26/2004 |
John T. Conway |
Spencer Abraham |
Board Agrees to an Extension of 45 Days to Submit Implementation Plan for Recommendation 2004-1 |
PDF |
|
12/14/2004 |
John T. Conway |
Spencer Abraham |
Safety Management of Complex, High-Hazard Organizations |
PDF |
|
12/22/2004 |
John T. Conway |
Kyle E. McSlarrow |
Comments on DOE Policy 226.1, "Department of Energy Oversight Policy" |
PDF |
|
12/23/2004 |
Spencer Abraham |
John T. Conway |
DOE Implementation Plan in Response to the Board's Recommendation 2004-1, Oversight of Complex, High-Hazard Nuclear Operations |
PDF |
|
2/14/2005 |
John T. Conway |
Samuel W. Bodman |
Comments on the DOE's Implementation Plan to Improve Oversight of Nuclear Operations |
PDF |
|
3/14/2005 |
Samuel W. Bodman |
John T. Conway |
DOE Responds to Board Letter Dated February 14, 2005 Regarding 2004-1 Implementation Plan |
PDF |
|
4/26/2005 |
Bruce M. Carnes |
A. J. Eggenberger |
DOE Forwards the Newly Established Roles and Responsibilities for the Central Technical Authorities and Nuclear Research Office, Deliverables in the DOE's 2004-1 Implementation Plan |
PDF |
|
6/10/2005 |
Samuel W. Bodman |
A. J. Eggenberger |
DOE Forwards the 2004-1 Implementation Plan, Revision 1 |
PDF |
|
7/29/2005 |
Clay Sell |
A. J. Eggenberger |
DOE's Action Plan, "Lessons Learned from the Columbia Space Shuttle Accident and Davis-Besse Reactor Pressure-Vessel Head Corrosion Event," Completing Commitment 17 in the 2004-1 |
PDF |
|
7/29/2005 |
Roy J. Schepens |
A. J. Eggenberger |
DOE Reports Completion of Commitment 11 in the 2004-1 Implementation Plan, Revision 1 |
PDF |
|
8/5/2005 |
A. J. Eggenberger |
Samuel W. Bodman |
Recommended Additions to the Project Execution Plan to Improve Oversight of Nuclear Operations for Approval of Implementation Plan |
PDF |
|
8/5/2005 |
Bruce M. Carnes |
A. J. Eggenberger |
DOE Reports Completion of Commitment 21 in the 2004-1 Implementation Plan |
PDF |
|
8/30/2005 |
Clay Sell |
A. J. Eggenberger |
DOE Federal Technical Capability Program (FTCP) Corrective Action Plan |
PDF |
|
9/27/2005 |
David K. Garman |
A. J. Eggenberger |
DOE Provides Interim Status and Reporting Partial Completion of Commitment 12 in the 2004-1 Implementation Plan |
PDF |
|
10/3/2005 |
Bruce M. Carnes |
A. J. Eggenberger |
DOE Reports Completion of Commitment 4B in the 2004-1 Implementation Plan |
PDF |
|
10/11/2005 |
A. J. Eggenberger |
Clay Sell |
Board Issues a Reporting Requirement to DOE for a Report within 45 days on Approach and Schedule to Address Board Comments |
PDF |
|
10/31/2005 |
John Spitaleri Shaw |
A. J. Eggenberger |
DOE Reports Completion of Commitment 7A in the 2004-1 Implementation Plan |
PDF |
|
11/30/2005 |
Inés R. Triay |
A. J. Eggenberger |
DOE Forwards the Office of Environmental Management Quality Assurance Program Plan (QAPP), Completing Commitment 10A in the 2004-1 Implementation Plan |
PDF |
|
12/6/2005 |
John Spitaleri Shaw |
A. J. Eggenberger |
DOE Forwards the Office of Environment, Safety and Health Management System for Quality and Safety Management (EM MS), Completing Commitment 10A in the 2004-1 Implementation Plan |
PDF |
|
12/6/2005 |
Thomas P. D'Agostino |
A. J. Eggenberger |
DOE Forwards the Office of Defense Programs Quality Assurance Program (QAP), Completing Commitment 10A in the 2004-1 Implementation Plan |
PDF |
|
12/16/2005 |
A. J. Eggenberger |
Samuel W. Bodman |
Board Letter Regarding the New DOE Manual on Integrated Safety Management (ISM) |
PDF |
|
12/27/2005 |
Clay Sell |
A. J. Eggenberger |
DOE Forwards the Deputy Secretary's Memorandum Regarding the DOE's Process Criteria and Attributes for Delegations of Safety Responsibilities, Completing Commitment 9A in the 2004-1 Implementation Plan |
PDF |
|
1/20/2006 |
A.J. Eggenberger |
Samuel W. Bodman |
Integrated Safety Management: The Foundation for a Successful Safety Culture |
PDF |
|
1/31/2006 |
Jerald S. Paul |
A. J. Eggenberger |
DOE Central Technical Authority for the NNSA has Completed Commitment 2 in the 2004-1 Implementation Plan |
PDF |
|
2/3/2006 |
Patrice M. Bubar |
A. J. Eggenberger |
DOE Status of Commitment 7B in the Recommendation 2004-1 Implementation Plan |
PDF |
|
2/10/2006 |
Thomas P. D'Agostino |
A. J. Eggenberger |
DOE Update on Path Forward and Schedule for Achieving FuII Implementation of the Site Office Quality Assurance Programs, Commitment 10 A of the 2004-1 Implementation Plan |
PDF |
|
2/28/2006 |
Linton F. Brooks |
A. J. Eggenberger |
DOE Reporting Completion of NNSA Portion of Commitment 23 in the 2004-1 Implementation Plan |
PDF |
|
3/1/2006 |
Inés R. Triay |
A. J. Eggenberger |
DOE Office of Environmental Management Standing Operating Policy and Procedure for Delegation of Safety Authorities (SOPP PS-5.15) |
PDF |
|
3/3/2006 |
A. J. Eggenberger |
Samuel W. Bodman |
Oversight Programs of the Savannah River Operations Office |
PDF |
|
3/3/2006 |
David K. Garman |
A. J. Eggenberger |
DOE Transmittal of Approved Site Action Plans to Improve Work Planning and Work Control (Commitment 23) and to Improve Feedback and Improvement (Commitment 25) |
PDF |
|
3/13/2006 |
Jerald Paul |
A. J. Eggenberger |
DOE NNSA Approach and Schedule for Actions Necessary to Complete Commitment 9B of the Board's Recommendation 2004-1 |
PDF |
|
3/14/2006 |
Thomas P. D'Agostino |
A. J. Eggenberger |
DOE Completion of NNSA Portion of Commitment 25 in the 2004-1 Implementation Plan, which Requires NNSA to Develop Site Office Action Plans to Improve Feedback and Improvement Core Element Performance |
PDF |
|
3/29/2006 |
Inés R. Triay |
A. J. Eggenberger |
DOE Completion of Environmental Management's Portion of Commitment 10B in the 2004-1 Implementation Plan, Oversight of Complex, High-Hazard Nuclear Operations, which Requires EM to Develop Quality Assurance Plans |
PDF |
|
4/24/2006 |
A.J.Eggenberger |
James A. Rispoli |
Review of Activity Level Work Planning and Control by Fluor Hanford, Inc. |
PDF |
|
5/9/2006 |
David K. Garman |
A. J. Eggenberger |
DOE Update on the Energy, Science and Environment (ESE) portion of Commitment 2 in the 2004-1 implementation Plan |
PDF |
|
5/16/2006 |
Joseph F. Bader |
DOE |
Statement By The Honorable Joseph F. Bader, Member, Defense Nuclear Facilities Safety Board Presented at the Department of Energy's 13th Annual Facility Representative Workshop |
PDF |
|
6/26/2006 |
A. J. Eggenberger |
Samuel W. Bodman |
Board Requests Crosswalk on Where the EH Safety Responsibilities will Reside if Decision is Made for DOE and NNSA Reorganization |
PDF |
|
7/24/2006 |
Samuel W. Bodman |
A. J. Eggenberger |
DOE Letter Providing Status and Path Forward for the 2004-1 implementation Plan, Oversight of Complex, High-Hazard Nuclear Operations |
PDF |
|
8/15/2006 |
C. Russell H. Shearer |
A. J. Eggenberger |
DOE Recent Completion of 2004-1 Implementation Plan Review and Decision to Modify DOE O 226.1 |
PDF |
|
9/8/2006 |
Glenn S. Podonsky |
A. J. Eggenberger |
DOE Completes Review of the 2004-1 Implementation Plan Actions and Decides to Modify DOE 0 226.1 |
PDF |
|
9/19/2006 |
Thomas P. D'Agostino |
A. J. Eggenberger |
NNSA Office of Defense Programs Portion of Commitment 10B in DOE Implementation Plan for Recommendation 2004-1 has been Completed |
PDF |
|
10/3/2006 |
Mark B. Whitaker, Jr. |
A. J. Eggenberger |
DOE Technical Professional Career Development Program for Board 2004-1 Implementation Plan, this Deliverable Completes the Planned Activities under Commitment 12 of that Plan |
PDF |
|
10/12/2006 |
Samuel W. Bodman |
A.J. Eggenberger |
DOE Implementation Plan for Recommendation 2004-1 |
PDF |
|
10/12/2006 |
Samuel W. Bodman |
A. J. Eggenberger |
DOE has Updated Its Implementation Plan to Improve Oversight of Nuclear Operations, Developed in Response to Board recommendation 2004-1 |
PDF |
|
10/30/2006 |
David K. Garman |
A. J. Eggenberger |
DOE Central Technical Authority for Energy has Completed Commitment 2 in the 2004-1 Implementation Plan, Revision 2, Dated October 12, 2006 |
PDF |
|
11/7/2006 |
Mark B. Whitaker, Jr. |
A. J. Eggenberger |
DOE Reports Completion of Commitment 22B in the 2004-1 Implementation Plan, with the Issuance of DOE Manual 450-4.1, Integrated Safety Management System Manual |
PDF |
|
11/21/2006 |
A. J. Eggenberger |
Samuel W. Bodman |
Board Finds October 12, 2006, Implementation Plan to be Responsive to Recommendation 2004-1; Board Closes Recommendation 95-2 |
PDF |
|
1/17/2007 |
Clay Sell |
A. J. Eggenberger |
DOE Forwards the Federal Technical Capability Program (FTCP) Corrective Action Plan, Revision 1, Deliverable B for Commitment 13 in the 2004-1, Revision 2 Implementation Plan |
PDF |
|
1/30/2007 |
Thomas P. D'Agostino |
A. J. Eggenberger |
DOE Reports Completion of NNSA's Portion of Commitment 3 in Revision 2 of the 2004-1 Implementation Plan |
PDF |
|
2/13/2007 |
Thomas P. D'Agostino |
A. J. Eggenberger |
DOE Provides Status of NNSA Activities to Complete Commitment 9B in the 2004-1 Implementation Plan, Oversight of Complex, High-Hazard Nuclear Operations |
PDF |
|
4/4/2007 |
Inés R. Triay |
A. J. Eggenberger |
DOE Forwards the Office of Envirnomental Management Self-Assessment Report, Completing Commitment 9C in the 2004-1 Implementation Plan, Oversight of Complex, High-Hazard Nuclear Operations |
PDF |
|
5/1/2007 |
Inés R. Triay |
A. J. Eggenberger |
DOE Reports Completion of EM Portion of Commitment 22C in the 2004-1 Implementation Plan, Oversight of Complex, High-Hazard Nuclear Operations, Which Requires the Issuance of an Approved EM Integrated Safety Management System Description |
PDF |
|
5/21/2007 |
William C. Ostendorff |
A. J. Eggenberger |
DOE Reports Completion of NNSA Portion of Commitment 9B in the 2004-1 Implementation Plan, which Required a Report to the Secretary on the Process and Criteria to Delegating Safety Authorities to the Field |
PDF |
|
8/20/2007 |
Inés R. Triay |
A. J. Eggenberger |
DOE Forwards the Corrective Action Plan (CAP) for Environmental Management Headquarters Safety Functions and Responsibilities Associated with Nuclear Facilities |
PDF |
|
8/20/2007 |
Mark B. Whitaker, Jr. |
A. J. Eggenberger |
DOE Reports Completion of HSS Portion of Commitment 22C in the 2004-1 Implementation plan |
PDF |
|
8/29/2007 |
Samuel W. Bodman |
A. J. Eggenberger |
DOE Revised Schedule for Implementation Plan 2004-1, Oversight of COmplex, High-Hazard Nuclear Operations, Commitment 5, Deliverable A for the Oversight Guide |
PDF |
|
10/16/2007 |
C. H. Albright, Jr. |
A. J. Eggenberger |
DOE Letter Informing that the Central Technical Authority (CTA) for the DOE has Completed Commitment 3 in Revision 2 of the 2004-1 Implementation Plan |
PDF |
|
11/1/2007 |
Frank B. Russo |
A. J. Eggenberger |
DOE Transmittal of NNSA Integrated Safety Management Systems Descriptions, NA-1 Supplemental Directive 450.4-1, Which Fulfills Commitment 22C in the 2004-1 Implementation Plan |
PDF |
|
11/1/2007 |
James M. Owendoff |
A. J. Eggenberger |
DOE Reporting Completion of Environmental Management (EM) Portion of Commitment 22D in the 2004-1 Implementation Plan |
PDF |
|
12/28/2007 |
James M. Owendoff |
A. J. Eggenberger |
DOE Letter Regarding the Report on the Implementation of the DOE Operating Experience Program in the Office of EM as Specified in Commitment 19.2 of the Implementation Plan, Revision 2, October 2006 |
PDF |
|
2/14/2008 |
Thomas P. D'Agostino |
A. J. Eggenberger |
DOE Implementation of the Operating Experience Program for the NNSA as Specified in Commitment 19 of Implementation Plan, Revision 2, October 2006 |
PDF |
|
3/28/2008 |
A. J. Eggenberger |
Samuel W. Bodman |
Board Closes Recommendation 98-1, Resolution of Issues Identified by DOE Internal Oversight |
PDF |
|
4/29/2008 |
Robert L. Smolen |
A. J. Eggenberger |
DOE Notification to the Board that Responsibility for Nuclear Safety Research and Development has been Transferred to Dr. Kevin Greenaugh |
PDF |
|
8/21/2008 |
Robert L. Smolen |
A. J. Eggenberger |
DOE Interim National Nuclear Security Administration Response to Commitment 22D of the DOE Implementation Plan to Improve Oversight of Nuclear Operations, dated October 2006 |
PDF |
|
10/31/2008 |
James M. Owendoff |
A. J. Eggenberger |
DOE Status Report on the Office of Environmental Management Implementation of the DOE Corporate Operating Experience Program |
PDF |
|
11/12/2008 |
Robert L. Smolen |
A. J. Eggenberger |
DOE Final National Nuclear Security Administration Response to Commitment 22D of Implementation Plan to Improve Oversight of Nuclear Operations, dated October 2006 |
PDF |
|
3/19/2009 |
Karen L. Boardman |
A. J. Eggenberger |
DOE Forwards Federal Technical Capabilities Program Corrective Action Plan, Revision 2, Deliverable B for Commitment 13 in the Implementation Plan |
PDF |
|
3/23/2009 |
Peter S. Winokur |
Steven Chu |
Congratulations to and Presentation of the Board's Views on the State of Nuclear Safety at DOE Defense Nuclear Facilities to Dr. Steven Chu |
PDF |
|
4/22/2009 |
Thomas P. D'Agostino |
A. J. Eggenberger |
NNSA Progress Report on the Implementation of DOE O 210.2, DOE Corporate Operating Experience Program, for Calendar Year 2008 |
PDF |
|
6/10/2009 |
A.J. Eggenberger |
Kristina M. Johnson |
Congratulations, Introduction and Forwarding of 3/23/2009 letter to Secretary Steven Chu to Under Secretary Kristina M. Johnson |
PDF |
|
8/25/2009 |
John E. Mansfield |
Steven Chu |
Topics for September 29, 2009 Public Meeting on Implementation of Board Recommendation 2004-1 |
PDF |
|
12/2/2009 |
John E. Mansfield |
Thomas P. D'Agostino |
Activity-Level Work Planning at Los Alamos National Laboratory |
PDF |
|
3/12/2010 |
John E. Mansfield |
Inés R. Triay |
Activity-Level Work Planning, Hanford Tank Farms |
PDF |
|
5/12/2010 |
|
|
DOE Implementation of Recommendation 2004-1 (2nd) |
Federal Register Notice |
|
6/10/2010 |
Peter S. Winokur |
Glenn S. Podonsky |
Expressing thanks to Mr. Glenn S. Podonsky for testimony given at 5/12/2010 Public Hearing |
PDF |
|
6/10/2010 |
Peter S. Winokur |
Thomas P. D'Agostino |
Expressing thanks to Mr. Thomas P. D'Agostino for testimony given at 5/12/2010 Public Hearing |
PDF |
|
6/14/2010 |
Peter S. Winokur |
Thomas P. D'Agostino |
Activily·Level Work Planning, Lawrence Livermore National Laboratory |
PDF |
|
9/23/2010 |
Peter S. Winokur |
Inés R. Triay |
Activity-Level Work Planning, Hanford Plateau Remediation Contractor |
PDF |
|
10/22/2010 |
Peter S. Winokur |
Inés R . Triay |
Activity-Level Work Planning and Execution, Waste Isolation Pilot Plant |
PDF |
|
2/3/2011 |
Glenn S. Podonsky |
Peter S. Winokur |
Deliverables 5.2.1 and 5.2.2 for the Implementation Plan of Board Recommendation 2004-1 |
PDF |
|
3/31/2011 |
|
|
DOE Implementation of Recommendation 2004-1 (3rd) |
|
|
5/5/2011 |
|
|
Recommendation 2004-1, Oversight of Complex, High-Hazard Nuclear Operations |
|
|
8/30/2011 |
Daniel B. Poneman |
Peter S. Winokur |
DOE Provides Updated Implementation Plan for Recommendation 2004-1. The Office of Health, Safety and Security (HSS) Will Now Function as the Integrating Organization for Commitments Seven and Eight Only |
PDF |
|
5/17/2012 |
Daniel B. Poneman |
Peter S. Winokur |
DOE Letter Concerning its Commitment and Actions to Improve Work Planning and Control (WP&C) at DOE Defense Nuclear Facilities |
PDF |
|
7/3/2012 |
Glenn S. Podonsky |
Peter S. Winokur |
DOE Provides Update on Commitments Seven and Eight in the DOE's Implementation Plan for Recommendation 2004-1, Oversight of Complex, High-Hazard Nuclear Operations |
PDF |
|
8/28/2012 |
Peter S. Winokur |
Daniel B. Poneman |
Board Issues a Reporting Requirement Concerning Integrated Safety Management at the Activity Level: Work Planning and Control |
PDF |
|
11/30/2012 |
Daniel B. Poneman |
Peter S. Winokur |
DOE Response to Board August 28, 2012, Letter which Issued a Reporting Requirement Concerning Integrated Safety Management at the Activity Level: Work Planning and Control |
PDF |