|
7/31/1995 |
Review of Hanford Systems Engineering and Implementation of Recommendation 92-4, June 27-29, 1995 |
Ralph Arcaro |
Staff Issue Report |
PDF |
|
7/31/1995 |
Report on Sandia National Laboratories-New Mexico (SNL-NM), Emergency Response Exercise "Rubble Glow" |
John Deplitch |
Staff Issue Report |
PDF |
|
7/27/1995 |
Review of Low-Level Waste and OU-4 Vitrification Pilot Plant at Fernald |
Larry Zull |
Staff Issue Report |
PDF |
|
7/26/1995 |
Device Assembly Facility Review |
George W. Cunningham |
Staff Issue Report |
PDF |
|
7/25/1995 |
Tank Farm Radiological Protection, Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Report of Site Visit, June 27-29, 1995 |
Daniel G. Ogg |
Staff Issue Report |
PDF |
|
7/21/1995 |
Building 371 and 776 Ventilation at Rocky Flats |
John T. Conway |
Staff Issue Report |
PDF |
|
7/11/1995 |
Savannah River Site (SRS) - Review of Conduct of Operations and Engineering at the Defense Waste Processing Facility (DWPF) and the In-Tank Precipitation (ITP) Facility |
John T. Conway |
Staff Issue Report |
PDF |
|
7/5/1995 |
Trip Report from DNFSB Staff Visit to Savannah River Site to Discuss K-Reactor Axial Power Monitors |
George W. Cunningham |
Staff Issue Report |
PDF |
|
7/5/1995 |
Trip Report on DOE Fifteenth Annual Low-Level Radioactive Waste Management Conference, December 1-3, 1993 |
George W. Cunningham |
Staff Issue Report |
PDF |
|
7/5/1995 |
Implementation of Recommendations 90-2 Standards (maintenance portion only) and 92-2 Facility Representatives at the Defense Waste Processing Facility |
George W. Cunningham |
Staff Issue Report |
PDF |
|
7/5/1995 |
Savannah River Site - Review of Ventilation and Configuration Management at the Defense Waste Processing Facility (DWPF)Trip Report (February 13-16, 1995) |
George W. Cunningham |
Staff Issue Report |
PDF |
|
7/5/1995 |
Trip Report to Rocky Flats, January 3-6, 1995 - Review of Criticality Safety and Building 707 Thermal Stabilization Preparations |
George W. Cunningham |
Staff Issue Report |
PDF |
|
7/5/1995 |
KE-Basin Radiological Engineering Assessment |
George W. Cunningham |
Staff Issue Report |
PDF |
|
7/5/1995 |
Review of Implementation of Board Recommendation 92-4 and Hanford Tank Farm Activities |
George W. Cunningham |
Staff Issue Report |
PDF |
|
7/5/1995 |
Report of Facility Representatives at Rocky Flats |
George W. Cunningham |
Staff Issue Report |
PDF |
|
7/5/1995 |
Training and Qualification Review at the In-Tank Precipitation Facility (ITP), Savannah River Site (SRS) |
George W. Cunningham |
Staff Issue Report |
PDF |
|
7/5/1995 |
Hanford Site Decommissioning Trip Report, April 24-27, 1995 |
George W. Cunningham |
Staff Issue Report |
PDF |
|
7/5/1995 |
Trip Report on Ventilation Systems at Pantex, June 6-9, 1994 |
George W. Cunningham |
Staff Issue Report |
PDF |
|
7/5/1995 |
Trip Report - Pantex - Status of Order Compliance |
George W. Cunningham |
Staff Issue Report |
PDF |
|
7/5/1995 |
Pantex Plant - Trip Report on Staff Review of the Pantex Emergency Preparedness Exercise, PXCOM-94. |
George W. Cunningham |
Staff Issue Report |
PDF |
|
7/5/1995 |
Radiolytic Hydrogen Generation in Rocky Flats Plutonium-Nitric Acid Solution Tanks |
George W. Cunningham |
Staff Issue Report |
PDF |
|
7/5/1995 |
Trip Report - Review of Derivation and Implementation of Hanford Tank Farm Operational Safety Requirements, December 12-15, 1994 |
George W. Cunningham |
Staff Issue Report |
PDF |
|
7/5/1995 |
Pantex Site - DNFSB Staff Trip Report - W55 Case Cutting Incident |
George W. Cunningham |
Staff Issue Report |
PDF |
|
7/5/1995 |
Trip Report - Review of Actions Taken to Assure Readiness for Special Unload Operations at the Mound Plant |
George W. Cunningham |
Staff Issue Report |
PDF |
|
7/5/1995 |
Hanford Washington Site - DNFSB Technical Staff Report on Radiological and Environmental Safety Programs |
DNFSB |
Staff Issue Report |
PDF |
|
6/23/1995 |
Safety Analyses and Thermal-Hydraulic Performance, Advanced Test Reactor, Idaho National Engineering Laboratory, Report of Site Visit, May 2-4, 1995 |
John T. Conway |
Staff Issue Report |
PDF |
|
6/17/1995 |
Readiness of EG&G's Mound Special Unload Operations |
DNFSB |
Staff Issue Report |
PDF |
|
6/16/1995 |
Review of Reservoir Unloading and Tritium Storage at Savannah River Site |
William Yeniscavich |
Staff Issue Report |
PDF |
|
6/14/1995 |
In-Tank Precipitation Facility (ITP) Safety Envelope Review - Trip Report (April 26, 1995) |
John T. Conway |
Staff Issue Report |
PDF |
|
6/9/1995 |
AT400A Pit Storage and Shipping Container Design and Repackaging |
Joe Sanders |
Staff Issue Report |
PDF |
|
6/2/1995 |
Report on Review of F-Canyon and FB-Line Safety Envelopes - Savannah River Site |
A. De La Paz |
Staff Issue Report |
PDF |
|
5/25/1995 |
Trip Report - Workshop on Combustible Residues and Meeting on Residue Drum Safety, April 19-20, 1995 |
DNFSB |
Staff Issue Report |
PDF |
|
5/15/1995 |
Savannah River Site Spent Fuel Storage Trip Report, January 3-6, 1995 |
George W. Cunningham |
Staff Issue Report |
PDF |
|
5/15/1995 |
Savannah River Site (SRS) -- Recommendation 94-1, Americium/Curium (Am/Cm) Processing Program Status (January 25, 1995) |
George W. Cunningham |
Staff Issue Report |
PDF |
|
5/15/1995 |
Savannah River Site (SRS) - In-Tank Precipitation (ITP) and Defense Waste Processing Facility (DWPF) - Trip Report (January 4-6, 1995) |
George W. Cunningham |
Staff Issue Report |
PDF |
|
5/15/1995 |
Radioactive Waste Management Review at the Rocky Flats Environmental Technology Site |
George W. Cunningham |
Staff Issue Report |
PDF |
|
5/15/1995 |
Savannah River Site (SRS) - Review of In-Tank Precipitation (ITP) Facility Contractor Operational Readiness Review Process and Quality Assurance Program |
George W. Cunningham |
Staff Issue Report |
PDF |
|
5/15/1995 |
Waste Management and Environmental Restoration, Idaho National Engineering Laboratory, Report of Site Visit, February 7 - 9, 1995 |
George W. Cunningham |
Staff Issue Report |
PDF |
|
5/15/1995 |
DOE Order 6430.1A Compliance Review of the In-Tank Precipitation Facility |
George W. Cunningham |
Staff Issue Report |
PDF |
|
5/15/1995 |
Hanford - Review of Preparations to Install K-Basin Chute Barriers |
George W. Cunningham |
Staff Issue Report |
PDF |
|
5/15/1995 |
Rocky Flats - Restart Activities |
George W. Cunningham |
Staff Issue Report |
PDF |
|
5/5/1995 |
Los Alamos National Laboratory - Chemistry and Metallurgy Research and Technical Area 55 - Trip Report (January 23-26, 1995) |
John T. Conway |
Staff Issue Report |
PDF |
|
5/2/1995 |
Fuel Transfers and the New Waste Calcining Facility, Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Report of Site Visit, March 28-30, 1995 |
Daniel G. Ogg |
Staff Issue Report |
PDF |
|
4/28/1995 |
Nuclear Explosive Safety Study (NESS) for Interim Storage of W-48 Weapons at the Nevada Test Site |
John T. Conway |
Staff Issue Report |
PDF |
|
4/26/1995 |
Trip Report - Review of Hanford Site High-Level Waste Tank Safety and Characterization, March 14-16, 1995 |
DNFSB |
Staff Issue Report |
PDF |
|
4/20/1995 |
Savannah River Site (SRS) - In-Tank Precipitation (ITP) Safety Envelope Review Trip Report (January 31- February 2, 1995) |
John T. Conway |
Staff Issue Report |
PDF |
|
4/19/1995 |
Report of Trip to Old HB-Line - Rooms 302, 304 & 306 |
George W. Cunningham |
Staff Issue Report |
PDF |
|
4/19/1995 |
DNFSB Staff Comments on the Defense Waste Processing Facility Draft Supplemental Environmental Impact Statement |
George W. Cunningham |
Staff Issue Report |
PDF |
|
4/19/1995 |
Tritium Testing and Safety Analyses, Idaho National Engineering Laboratory, Advanced Test Reactor, Report of Site Visit, August 30-September 1, 1994 |
George W. Cunningham |
Staff Issue Report |
PDF |
|
4/19/1995 |
Backup Power Supply Systems, Idaho National Engineering Laboratory - Idaho Chemical Processing Plant, Report of Site Visit, November 30 - December 1, 1994 |
George W. Cunningham |
Staff Issue Report |
PDF |