Recent Board Activity

Date Titlesort icon Author Type Download
12/28/1998 Deliverable Pursuant to Commitment 5.2.2 per the 93-3 Implementation Plan Thomas W. Evans Letter application/pdf iconPDF
2/3/2011 Deliverables 5.2.1 and 5.2.2 for the Implementation Plan of Board Recommendation 2004-1 Glenn S. Podonsky Letter application/pdf iconPDF
12/29/2010 Department Letter Providing a Quarterly Update on the Status of the Structural Steel Peer Review Team at the WTP Inés R. Triay Letter application/pdf iconPDF
12/21/2010 Department Letter Providing Corrective Action Plan for the Electrical Safety Program at WIPP Inés R. Triay Letter application/pdf iconPDF
9/10/2003 Department Letter Responding to Board Reporting Requirement Dated July 9, 2003 Regarding Recommendations by the National Nuclear Security Administration's Senior Technical Advisory Panel on Nuclear Explosive Safety Study (NESS) and Readiness Reviews David E. Beck Letter application/pdf iconPDF
2/28/2012 Department of Energy Annual Report on Nuclear Criticality Safety for Fiscal Year (FY) 2011 Donald L. Cook Letter application/pdf iconPDF
3/29/2002 Department of Energy Should Take Advantage of the Technical Expertise Available through Existing Contractual Arrangements with the Center for Chemical Process Safety and the Institute for Nuclear Power Operations John T. Conway Letter application/pdf iconPDF
1/9/2003 Department of Energy’s Quality Assurance Improvement Plan for Defense Nuclear Facilities John T. Conway Letter application/pdf iconPDF
7/21/2000 Department Quarterly Report for Implementation Plan 98-2 R. E. Glass Letter application/pdf iconPDF
11/30/1998 Description of How the Model Policies and Procedures to Preserve Facility Representative Capabilities and Positions have been Implemented per the 93-3 Implementation Plan Thomas W. Evans Letter application/pdf iconPDF
12/15/2000 Design and Construction of Los Alamos Experimental Confinement and Safety Vessels John T. Conway Letter application/pdf iconPDF
3/15/2005 Design-Build Approach for the Chemistry and Metallurgy Research Facility Replacement at the Los Alamos National Laboratory Everet H. Beckner Letter application/pdf iconPDF
6/10/1998 Development of a New U-2333 Packaging and Storage Standard in Accordance with the 97-1 Implementation Plan John T. Conway Letter application/pdf iconPDF
2/8/2005 Device Assembly Facility Operations at the Nevada Test Site Everet H. Beckner Letter application/pdf iconPDF
4/14/2003 Disposition of Highly Enriched Uranium Solutions at the Savannah River Site Jessie Hill Roberson Letter application/pdf iconPDF
2/20/2001 DNFSB Perspective on Rocky Flats Environmental Technology Site FY2000 Performance for "RFETS State of the Flats" Site Representative - RFETS Letter application/pdf iconPDF
2/29/2008 DOE Clarification of Specific Commitments Related to the Implementation Plan for Board Recommendation 2007-1, Safety-Related in Situ Nondestructive Assay of Radioactive Materials Richard H. Lagdon, Jr. Letter application/pdf iconPDF
3/1/1997 DOE "DNFSB 94-2 Implementation Plan Section IX, Research and Development Task 1: DOE R&D Activities Assessment" DOE Letter application/pdf iconPDF
3/1/1997 DOE "DNFSB 94-2 Implementation Plan Section IX, Research and Development Task 2: DOE R&D Needs Assessment" DOE Letter application/pdf iconPDF
4/28/1996 DOE "Low-Level Waste Program Requirements Document" for the 94-2 Implementation Plan Stephen P. Cowan Letter application/pdf iconPDF
12/26/1996 DOE "Low-Level Waste Projection Program Guide" Alvin A. Alm Letter application/pdf iconPDF
4/1/2002 DOE - Building 12-64 at the Pantex Plant for Future Nuclear Explosive Operations Everet H. Beckner Letter application/pdf iconPDF
3/11/1998 DOE 12th Quarterly Report which Fulfills Commitment 7.1 for Recommendation 94-4 Gene Ives Letter application/pdf iconPDF
2/27/1997 DOE 1996 Annual Report to Congress, Issued February 19, 1997 Charles B. Curtis Letter application/pdf iconPDF
2/13/1995 DOE 1st Quarterly Status Report for GY 95 93-2 Implementation Plan Victor H. Reis Letter application/pdf iconPDF
4/7/2009 DOE 2008 Summary Structural Reports for the High Level Waste and Pretreatment Facilities John R. Eschenberg Letter application/pdf iconPDF
4/28/1997 DOE 2nd Quarter FY 1997 Status Report, Recommendation 92-4 John D. Wagoner Letter application/pdf iconPDF
5/14/2001 DOE 2nd Quarterly Status Report for FY 2001 in Relation to Implementation Plan 97-2 David H. Crandall Letter application/pdf iconPDF
8/7/2002 DOE 3rd Quarter Status Report for Fiscal Year 2002 on the 97-2 Implementation Plan David H. Crandall Letter application/pdf iconPDF
8/19/1999 DOE 3rd Quarter Status Report for the 97-2 Implementation Plan Gilbert G. Weigand Letter application/pdf iconPDF
11/21/2001 DOE 4th Quarter Status Report for FY 2001 Relative to Implementation Plan 97-2 David H. Crandall Letter application/pdf iconPDF
10/24/2000 DOE 4th Quarter Status Report of Fiscal Year 2000 on Implementation Plan 97-2, Criticality Safety David H. Crandall Letter application/pdf iconPDF
1/29/2003 DOE 4th Quarterly Report on the 98-2 Implementation Plan for Fiscal Year 2002 David E. Beck Letter application/pdf iconPDF
1/16/1995 DOE 90-2 Quarterly Status Report for July - September, 1995 Everet H. Beckner Letter application/pdf iconPDF
1/27/1998 DOE 93-5 Implementation Plan Quarterly Report for October through December 1997 John D. Wagoner Letter application/pdf iconPDF
2/23/1994 DOE 93-5 Implementation Plan, Which Incorporates Final Comments and Corrections Thomas P. Grumbly Letter application/pdf iconPDF
4/30/1997 DOE 93-5 Quarterly Report for January through March 1997 John D. Wagoner Letter application/pdf iconPDF
4/23/1996 DOE 94-1 Annual Report (February 28, 1995 - February 29, 1996) Richard J. Guimond Letter application/pdf iconPDF
4/28/1997 DOE 96-1 Implementation Plan Deliverable - Test Plan for Actual Waste Confirming Studies Frank R. McCoy Letter application/pdf iconPDF
6/30/1994 DOE a Review of the Characterization Field Procedures as Part of Commitment 3.2 for the 93-5 Implementation Plan T. R. Sheridan Letter application/pdf iconPDF
9/15/1992 DOE Acceptance of the Board's 92-3 Recommendation with Implementation Plan Enclosed James D. Watkins Letter application/pdf iconPDF
8/30/1996 DOE Acceptance of the INEL Performance Assessment for the 94-2 Implementation Plan Alvin A. Alm Letter application/pdf iconPDF
9/15/1992 DOE Accepts 92-3 and Forwards the Implementation Plan James D. Watkins Letter application/pdf iconPDF
1/8/2003 DOE Accepts Board Recommendation 2002-2 Spencer Abraham Letter application/pdf iconPDF
1/31/2003 DOE Accepts Board Recommendation 2002-3, Requirements for the Design, Implementation, and Maintenance of Administrative Controls Spencer Abraham Letter application/pdf iconPDF
7/21/2004 DOE Accepts Board Recommendation 2004-1, Oversight of Complex, High-Hazard Nuclear Operations Spencer Abraham Letter application/pdf iconPDF
3/18/2005 DOE Accepts Board Recommendation 2004-2, Active Confinement Systems Samuel W. Bodman Letter application/pdf iconPDF
5/6/2005 DOE Accepts Board Recommendation 2005-1, Nuclear Material Packaging Samuel W. Bodman Letter application/pdf iconPDF
6/28/2007 DOE Accepts Board Recommendation 2007-1, Safety-Related in Situ Nondestructive Assay of Radioactive Materials Samuel W. Bodman Letter application/pdf iconPDF
2/10/2011 DOE Accepts Board Recommendation 2010-2 Steven Chu Letter application/pdf iconPDF