|
12/28/1998 |
Deliverable Pursuant to Commitment 5.2.2 per the 93-3 Implementation Plan |
Thomas W. Evans |
Letter |
PDF |
|
2/3/2011 |
Deliverables 5.2.1 and 5.2.2 for the Implementation Plan of Board Recommendation 2004-1 |
Glenn S. Podonsky |
Letter |
PDF |
|
12/29/2010 |
Department Letter Providing a Quarterly Update on the Status of the Structural Steel Peer Review Team at the WTP |
Inés R. Triay |
Letter |
PDF |
|
12/21/2010 |
Department Letter Providing Corrective Action Plan for the Electrical Safety Program at WIPP |
Inés R. Triay |
Letter |
PDF |
|
9/10/2003 |
Department Letter Responding to Board Reporting Requirement Dated July 9, 2003 Regarding Recommendations by the National Nuclear Security Administration's Senior Technical Advisory Panel on Nuclear Explosive Safety Study (NESS) and Readiness Reviews |
David E. Beck |
Letter |
PDF |
|
2/28/2012 |
Department of Energy Annual Report on Nuclear Criticality Safety for Fiscal Year (FY) 2011 |
Donald L. Cook |
Letter |
PDF |
|
3/29/2002 |
Department of Energy Should Take Advantage of the Technical Expertise Available through Existing Contractual Arrangements with the Center for Chemical Process Safety and the Institute for Nuclear Power Operations |
John T. Conway |
Letter |
PDF |
|
1/9/2003 |
Department of Energy’s Quality Assurance Improvement Plan for Defense Nuclear Facilities |
John T. Conway |
Letter |
PDF |
|
7/21/2000 |
Department Quarterly Report for Implementation Plan 98-2 |
R. E. Glass |
Letter |
PDF |
|
11/30/1998 |
Description of How the Model Policies and Procedures to Preserve Facility Representative Capabilities and Positions have been Implemented per the 93-3 Implementation Plan |
Thomas W. Evans |
Letter |
PDF |
|
12/15/2000 |
Design and Construction of Los Alamos Experimental Confinement and Safety Vessels |
John T. Conway |
Letter |
PDF |
|
3/15/2005 |
Design-Build Approach for the Chemistry and Metallurgy Research Facility Replacement at the Los Alamos National Laboratory |
Everet H. Beckner |
Letter |
PDF |
|
6/10/1998 |
Development of a New U-2333 Packaging and Storage Standard in Accordance with the 97-1 Implementation Plan |
John T. Conway |
Letter |
PDF |
|
2/8/2005 |
Device Assembly Facility Operations at the Nevada Test Site |
Everet H. Beckner |
Letter |
PDF |
|
4/14/2003 |
Disposition of Highly Enriched Uranium Solutions at the Savannah River Site |
Jessie Hill Roberson |
Letter |
PDF |
|
2/20/2001 |
DNFSB Perspective on Rocky Flats Environmental Technology Site FY2000 Performance for "RFETS State of the Flats" |
Site Representative - RFETS |
Letter |
PDF |
|
2/29/2008 |
DOE Clarification of Specific Commitments Related to the Implementation Plan for Board Recommendation 2007-1, Safety-Related in Situ Nondestructive Assay of Radioactive Materials |
Richard H. Lagdon, Jr. |
Letter |
PDF |
|
3/1/1997 |
DOE "DNFSB 94-2 Implementation Plan Section IX, Research and Development Task 1: DOE R&D Activities Assessment" |
DOE |
Letter |
PDF |
|
3/1/1997 |
DOE "DNFSB 94-2 Implementation Plan Section IX, Research and Development Task 2: DOE R&D Needs Assessment" |
DOE |
Letter |
PDF |
|
4/28/1996 |
DOE "Low-Level Waste Program Requirements Document" for the 94-2 Implementation Plan |
Stephen P. Cowan |
Letter |
PDF |
|
12/26/1996 |
DOE "Low-Level Waste Projection Program Guide" |
Alvin A. Alm |
Letter |
PDF |
|
4/1/2002 |
DOE - Building 12-64 at the Pantex Plant for Future Nuclear Explosive Operations |
Everet H. Beckner |
Letter |
PDF |
|
3/11/1998 |
DOE 12th Quarterly Report which Fulfills Commitment 7.1 for Recommendation 94-4 |
Gene Ives |
Letter |
PDF |
|
2/27/1997 |
DOE 1996 Annual Report to Congress, Issued February 19, 1997 |
Charles B. Curtis |
Letter |
PDF |
|
2/13/1995 |
DOE 1st Quarterly Status Report for GY 95 93-2 Implementation Plan |
Victor H. Reis |
Letter |
PDF |
|
4/7/2009 |
DOE 2008 Summary Structural Reports for the High Level Waste and Pretreatment Facilities |
John R. Eschenberg |
Letter |
PDF |
|
4/28/1997 |
DOE 2nd Quarter FY 1997 Status Report, Recommendation 92-4 |
John D. Wagoner |
Letter |
PDF |
|
5/14/2001 |
DOE 2nd Quarterly Status Report for FY 2001 in Relation to Implementation Plan 97-2 |
David H. Crandall |
Letter |
PDF |
|
8/7/2002 |
DOE 3rd Quarter Status Report for Fiscal Year 2002 on the 97-2 Implementation Plan |
David H. Crandall |
Letter |
PDF |
|
8/19/1999 |
DOE 3rd Quarter Status Report for the 97-2 Implementation Plan |
Gilbert G. Weigand |
Letter |
PDF |
|
11/21/2001 |
DOE 4th Quarter Status Report for FY 2001 Relative to Implementation Plan 97-2 |
David H. Crandall |
Letter |
PDF |
|
10/24/2000 |
DOE 4th Quarter Status Report of Fiscal Year 2000 on Implementation Plan 97-2, Criticality Safety |
David H. Crandall |
Letter |
PDF |
|
1/29/2003 |
DOE 4th Quarterly Report on the 98-2 Implementation Plan for Fiscal Year 2002 |
David E. Beck |
Letter |
PDF |
|
1/16/1995 |
DOE 90-2 Quarterly Status Report for July - September, 1995 |
Everet H. Beckner |
Letter |
PDF |
|
1/27/1998 |
DOE 93-5 Implementation Plan Quarterly Report for October through December 1997 |
John D. Wagoner |
Letter |
PDF |
|
2/23/1994 |
DOE 93-5 Implementation Plan, Which Incorporates Final Comments and Corrections |
Thomas P. Grumbly |
Letter |
PDF |
|
4/30/1997 |
DOE 93-5 Quarterly Report for January through March 1997 |
John D. Wagoner |
Letter |
PDF |
|
4/23/1996 |
DOE 94-1 Annual Report (February 28, 1995 - February 29, 1996) |
Richard J. Guimond |
Letter |
PDF |
|
4/28/1997 |
DOE 96-1 Implementation Plan Deliverable - Test Plan for Actual Waste Confirming Studies |
Frank R. McCoy |
Letter |
PDF |
|
6/30/1994 |
DOE a Review of the Characterization Field Procedures as Part of Commitment 3.2 for the 93-5 Implementation Plan |
T. R. Sheridan |
Letter |
PDF |
|
9/15/1992 |
DOE Acceptance of the Board's 92-3 Recommendation with Implementation Plan Enclosed |
James D. Watkins |
Letter |
PDF |
|
8/30/1996 |
DOE Acceptance of the INEL Performance Assessment for the 94-2 Implementation Plan |
Alvin A. Alm |
Letter |
PDF |
|
9/15/1992 |
DOE Accepts 92-3 and Forwards the Implementation Plan |
James D. Watkins |
Letter |
PDF |
|
1/8/2003 |
DOE Accepts Board Recommendation 2002-2 |
Spencer Abraham |
Letter |
PDF |
|
1/31/2003 |
DOE Accepts Board Recommendation 2002-3, Requirements for the Design, Implementation, and Maintenance of Administrative Controls |
Spencer Abraham |
Letter |
PDF |
|
7/21/2004 |
DOE Accepts Board Recommendation 2004-1, Oversight of Complex, High-Hazard Nuclear Operations |
Spencer Abraham |
Letter |
PDF |
|
3/18/2005 |
DOE Accepts Board Recommendation 2004-2, Active Confinement Systems |
Samuel W. Bodman |
Letter |
PDF |
|
5/6/2005 |
DOE Accepts Board Recommendation 2005-1, Nuclear Material Packaging |
Samuel W. Bodman |
Letter |
PDF |
|
6/28/2007 |
DOE Accepts Board Recommendation 2007-1, Safety-Related in Situ Nondestructive Assay of Radioactive Materials |
Samuel W. Bodman |
Letter |
PDF |
|
2/10/2011 |
DOE Accepts Board Recommendation 2010-2 |
Steven Chu |
Letter |
PDF |