11/27/1995 |
DOE Memorandum on the Y-12 Site Office Restart Team (YSORT) Receipt, Storage, and Shipment (RSS) Closure Report |
Thomas S. Tison |
Letter |
PDF |
|
11/21/1995 |
Board Notifies the DOE of Failure to Receive Evaluations and Assessments Related to Orders |
John T. Conway |
Letter |
PDF |
|
11/20/1995 |
Board Staff Trip Report on the Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS) |
Lani Miyoshi |
Staff Issue Report |
PDF |
|
11/18/1995 |
DOE Letter Regarding Mark 16 and Mark 22 Fuel Elements |
Thomas P. Grumbly |
Letter |
PDF |
|
11/17/1995 |
Shipping Weapons from Pantex to Department of Defense Facilities to Remove Reservoirs |
DNFSB |
Staff Issue Report |
PDF |
|
11/15/1995 |
Board Forwards Further Views with Respect to the Mark 16 and 22 Fuel Elements (Recommendation 94-1) |
John T. Conway |
Letter |
PDF |
|
11/9/1995 |
DOE's Assessment Report of Lockheed Martin Energy System Conduct of Operations per the 94-4 Implementation Plan |
DOE |
Letter |
PDF |
|
11/9/1995 |
Board Forwards DNFSB/TECH-7 Report of the Stabilization of Deteriorating Mark 16 and Mark 22 Aluminum-Alloy Spent Nuclear Fuel at the Savannah River |
John T. Conway |
Letter |
PDF |
|
11/8/1995 |
DOE Letter Transmitting ES&H's Office of Oversight Training Team Assessment Plan & Report for the EH Residents at the Oak Ridge SIte |
Tara O'Toole |
Letter |
PDF |
|
11/7/1995 |
DOE Reports 4-Week Delay in Completion of Milestone 3.2-020 per the 94-1 Implementation Plan |
Thomas P. grumbly |
Letter |
PDF |
|
11/6/1995 |
Trip Report on Savannah River Site (SRS) Defense Waste Processing Facility (DWPF) Electrical Systems |
John T. Conway |
Staff Issue Report |
PDF |
|
11/6/1995 |
Board Staff Letter Responding to the CERCLA Process |
George W. Cunningham |
Letter |
PDF |
|
11/3/1995 |
Los Alamos Critical Experiment Facility Safety Analysis Report Review (July 25-27,1995) |
John T. Conway |
Staff Issue Report |
PDF |
|
11/3/1995 |
DOE Forwards the October Deliverables per the 94-4 Implementation Plan |
Thomas P. Seitz |
Letter |
PDF |
|
11/3/1995 |
DOE's Third Quarterly Report per the 94-4 Implementation Plan |
DOE |
Letter |
PDF |
|
11/2/1995 |
Board Letter Expressing Comments Related to Its Public Meetings on Nuclear Safety Standards |
John T. Conway |
Letter |
PDF |
|
11/1/1995 |
Board Accepts the 95-1 Implementation Plan |
John T. Conway |
Letter |
PDF |
|
11/1/1995 |
DOE Forwards the 14th and Final Bimonthly Progress Report per the 92-6 Implementation Plan |
Everet H. Beckner |
Letter |
PDF |
|
10/31/1995 |
DOE Memorandum Regarding the October Deliverables, Task N.4.2., per the 94-4 Implementation Plan |
Robert J. Spence |
Letter |
PDF |
|
10/25/1995 |
DOE Forwards the Eighth Quarterly Status Report per the 91-6 Implementation Plan |
Tara O'Toole |
Letter |
PDF |
|
10/24/1995 |
Board Letter Rejecting RLOO's "Tank Waste Remediation System Risk Acceptance Criteria [Rec. 93-5]." |
John T. Conway |
Letter |
PDF |
|
10/24/1995 |
Board Letter Closing Recommendations 90-5, 90-6, 92-6, 92-5, 90-2 |
John T. Conway |
Letter |
PDF |
|
10/23/1995 |
DOE Regards the Structural Issues at Rocky Flats |
Thomas P. Grumbly |
Letter |
PDF |
|
10/20/1995 |
DOE Forwards Closure of Commitment 1.20 per the 93-5 Implementation Plan |
John D. Wagoner |
Letter |
PDF |
|
10/19/1995 |
DOE Forwards the Annual Report on the Status of Recommendation 93-2 for FY1995 |
Victor H. Reis |
Letter |
PDF |
|
10/16/1995 |
DOE Implementation Plan for Recommendation 1995-1 |
Hazel R. O'Leary |
Recommendation Implementation Plan |
PDF |
|
10/13/1995 |
Chemical Processing and Safety Basis at the New Waste Calcining Facility, Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Report of Site Visit, August 29-31, 1995 |
John T. Conway |
Staff Issue Report |
PDF |
|
10/13/1995 |
Savannah River Site In-Tank Precipitation Facility Safety Envelope Review - Trip Report (August 15, 1995) |
John T. Conway |
Staff Issue Report |
PDF |
|
10/13/1995 |
Board Concerns Spill Contingency Plans HLW Tank Famrs |
John T. Conway |
Letter |
PDF |
|
10/12/1995 |
Idaho National Engineering Laboratory - Idaho Chemical Processing Plant - Trip Report (August 8-10, 1995) |
John T. Conway |
Staff Issue Report |
PDF |
|
10/12/1995 |
Training, Qualifications, and Conduct of Operations at the Defense Waste Processing Facility, Savannah River Site, Report of Site Visit, August 21-25, 1995 |
John T. Conway |
Staff Issue Report |
PDF |
|
10/11/1995 |
Safety Management |
John T. Conway |
Recommendation |
PDF |
|
10/11/1995 |
DOE Response to Board Concerns over the "Ready 94" Emergency Response Program at Rocky Flats |
Thomas P. Grumbly |
Letter |
PDF |
|
10/11/1995 |
DOE Letter on Preliminary Evaluations of Seismic Safety in Building 371 |
Thomas P. Grumbly |
Letter |
PDF |
|
10/6/1995 |
Safety Management and Conduct of Operations at the Department of Energy's Defense Nuclear Facilities |
John T. Conway |
Technical Report |
PDF |
|
10/6/1995 |
Board Letter Expressing Concern over Emergency Preparedness throughout the DOE Complex and in Particular Rocky Flats with Its "Ready 94" Exercise |
John T. Conway |
Letter |
PDF |
|
10/5/1995 |
DOE Letter Regarding the In-Tank Processing Facility's High-Level Waste Tanks |
A. Lee Watkins |
Letter |
PDF |
|
10/4/1995 |
Board Letter Acknowledging Receipt of the Seventh Quarterly Report per the 93-4 Implementation Plan |
John T. Conway |
Letter |
PDF |
|
10/3/1995 |
Nuclear Explosive Safety Studies (NESS) |
John T. Conway |
Staff Issue Report |
PDF |
|
10/3/1995 |
Board Accepts the 94-3 Implementation Plan |
John T. Conway |
Letter |
PDF |
|
10/3/1995 |
DOE Forwards Commitment N.2.3 per the 94-4 Implementation Plan |
Thomas P. Seitz |
Letter |
PDF |
|
10/2/1995 |
Staff Comments on the Site Evaluation Survey for Low-Level Waste Management |
Steven Stokes |
Staff Issue Report |
PDF |
|
10/1/1995 |
DOE Conduct of Operations Assessment Plan per the 94-4 Implementation Plan |
DOE |
Letter |
PDF |
|
9/30/1995 |
DOE Third Quarterly Report per the 94-4 Implementation Plan |
DOE |
Letter |
PDF |
|
9/30/1995 |
DOE Quarterly Report for Period Ending September 30, 1995, per the 90-7 Implementation Plan |
DOE |
Letter |
PDF |
|
9/29/1995 |
DOE Forwards Closure of Commitment 1.20, Jan 95 and Jan 95 B04 per the 93-5 Implementation Plan |
Mary F. Jarvis |
Letter |
PDF |
|
9/29/1995 |
DOE Letter Closing Commitments 1.21.8 and 2.1 per the 93-5 Implementation Plan |
Mary F. Jarvis |
Letter |
PDF |
|
9/29/1995 |
DOE Provides a Report Discussing the Technical Basis for Closure of Particular Milestones per the 90-7 Implementation Plan |
Mary F. Jarvis |
Letter |
PDF |
|
9/29/1995 |
Closure of Defense Nuclear Facility Safety Board Recommendations 90-7.1, 90-7.2 and Clarification of Closure of 93-5.2.2 |
Mary F. Jarvis |
Letter |
PDF |
|
9/29/1995 |
DOE Letter Closing Commitments 1.21.07 per the 93-5 Implementation Plan |