|
8/15/2006 |
Board Requests that the Implementation Plan of July 12, 2006, be Revised and Resubmitted within 30 Days for the Board's Approval for Recommendation 2004-2 |
A. J. Eggenberger |
Letter |
PDF |
|
12/15/2006 |
Board Requests that NNSA Provide a Completion Date for the Final Assessment Report (DOE Commitment 4 .5.1) Recommendation 98-2 |
A. J. Eggenberger |
Letter |
PDF |
|
11/22/2005 |
Board Requests that Future Changes to 29 CFR Part 1910, Subpart 1096 and any OSHA Guidance or Revised Standards on Radiation Protection be Provided to the Board for Comment |
A. J. Eggenberger |
Letter |
PDF |
|
5/29/2001 |
Board Requests that DOE Review the Enclosed Comments and Provide a Written Response on DOE Plan for Transfer of All Long-Term Chemical Separations Activities at SRS from the F-Canyon Facility to the H-Canyon Facility |
John T. Conway |
Letter |
PDF |
|
10/23/2000 |
Board Requests that DOE Provide Documentation and a Briefing on Work Authorization Directives for the Pantex Plant Contractor to Determine Acceptability of Revised Implementation Plan |
John T. Conway |
Letter |
PDF |
|
3/4/2002 |
Board Requests that DOE Address in Upcoming Deliverable the Issues Identified Relative to Acceleration of the CSSX Program, Retention of Viable Backup Technology, Pursuit of Low-Activity Salt Disposal, and an Additional Evaporator at DWPF |
John T. Conway |
Letter |
PDF |
|
8/10/1998 |
Board Requests Technical Background Information Related to Seismic Design and Engineering for new Construction Project at SRS |
John T. Conway |
Letter |
PDF |
|
1/23/1996 |
Board Requests Report Describing the DOE's Plans to Define the Future Status of H-Canyon at Savannah River |
John T. Conway |
Letter |
PDF |
|
12/8/2003 |
Board Requests DOE Provide Experience and Qualifications of Personnel Involved in Preparation and Modifications of DOE Standards 3009 and 3011 as Regards Commitments 4.2.1 and 4.2.2, Recommendation 2002-3 |
John T. Conway |
Letter |
PDF |
|
6/26/2006 |
Board Requests Crosswalk on Where the EH Safety Responsibilities will Reside if Decision is Made for DOE and NNSA Reorganization |
A. J. Eggenberger |
Letter |
PDF |
|
3/14/1997 |
Board Requests Briefing on the USQ Related to Radiography Operations at the Pantex Plant |
John T. Conway |
Letter |
PDF |
|
6/7/2000 |
Board Requests Briefing on Safety Aspects of the Design of the Pit Disassembly and Conversion Facility as DOE Nears Final Title 1 Decision |
John T. Conway |
Letter |
PDF |
|
6/30/2000 |
Board Requests Briefing on DOE Response to Federal Technical Capability Panel Independent Assessment Report and the Annual Report to the Secretary of Energy on the Status of Federal Technical Capability |
John T. Conway |
Letter |
PDF |
|
5/3/2001 |
Board Requests Briefing on Actions Planned by DOE to Resolve Issues Associated with Lack of Requirements in the Standard for Glovebox Ambient Conditions and the use of Supercritical Fluid Extraction |
John T. Conway |
Letter |
PDF |
|
6/1/1998 |
Board Requests Additional Information on the Process by which the DOE Performs Change Control for Its Nuclear Explosive Operations at the Pantex Plant |
John T. Conway |
Letter |
PDF |
|
4/2/1997 |
Board Requests a Revision to the 93-3 Implementation Plan |
John T. Conway |
Letter |
PDF |
|
1/31/1996 |
Board Requests a Detailed Recovery Plan on the Delays in the Implementation of Recommendation 94-1 |
John T. Conway |
Letter |
PDF |
|
5/29/2003 |
Board Requests a Briefing on the Office of River Protection Proposals on Changes to the Waste Treatment Plant Safety Requirements Document |
John T. Conway |
Letter |
PDF |
|
2/9/1996 |
Board Requesting Extension to Comment on "Improving Regulation of Safety at DOE Nuclear Facilities" after Late Delivery |
John T. Conway |
Letter |
PDF |
|
3/31/2003 |
Board Request for Notification of Delays in Scheduled Completion of Fire Safety Improvement Projects at Los Alamos National Laboratory |
John T. Conway |
Letter |
PDF |
|
8/6/2010 |
Board Request for DOE Responses to Enclosed Questions, for the Public Meeting and Hearing of October 7 - 8, 2010 |
Peter S. Winokur |
Letter |
PDF |
|
5/12/2003 |
Board Request for Briefing on the Results of the DynEx Project Review of Control Hazards and Facility Utilization at Los Alamos National Laboratory |
John T. Conway |
Letter |
PDF |
|
9/15/1992 |
Board Report on the Status of Functional and Pre-Operational Testing for Building 707 |
John T. Conway |
Letter |
PDF |
|
4/19/1993 |
Board Report on the Replacement Tritium Facility at SRS |
John T. Conway |
Letter |
PDF |
|
3/24/2004 |
Board Reiteration of Request for List of DOE Waivers Granted to DOE Order 440.1A |
John T. Conway |
Letter |
PDF |
|
2/23/1995 |
Board Regards Changes in Measures in Connection with Characterization of High Level Nuclear Waste in Buried Tanks at the Hanford Site |
John T. Conway |
Letter |
PDF |
|
11/15/2002 |
Board Regarding the Need to Restart Disassembly and Inspection Operations for the W84 Program |
John T. Conway |
Letter |
PDF |
|
12/31/1997 |
Board Regarding Implementation of Recommendation 95-2, Integrated Safety Management System (ISMS) in Building 332 at Lawrence Livermore National Laboratory |
John T. Conway |
Letter |
PDF |
|
12/5/1997 |
Board Recommendations 93-1 and 95-2 in Relation to the 452-Series Orders, Standards, and Guide |
John T. Conway |
Letter |
PDF |
|
6/3/2011 |
Board Recognizes that Mr. Richard Denning of the Idaho Operations Office was Recently Honored as Facility Site Representative of the Year |
Peter S. Winokur |
Letter |
PDF |
|
6/3/2011 |
Board Recognizes that Mr. Dale West of Hanford's Richland Operations Office was Honored as the Winner of the 2010 DOE Safety System Oversight Annual Award |
Peter S. Winokur |
Letter |
PDF |
|
1/20/2000 |
Board Recognizes Joseph E. King as this Year's Safety Leadership Award Recipient (Stello Safety Leadership Award) |
John T. Conway |
Letter |
PDF |
|
4/29/1994 |
Board re: the Status of Standards for Natural Phenomena Hazards |
John T. Conway |
Letter |
PDF |
|
11/12/1997 |
Board re: the Ongoing Process of Reviewing and Evaluating the Content of Standards |
John T. Conway |
Letter |
PDF |
|
4/30/1996 |
Board re: the Nuclear Explosive Safety Study Process |
John T. Conway |
Letter |
PDF |
|
3/21/1996 |
Board re: the Need for Continued Reporting of Training Status by EM for Recommendation 91-6 |
John T. Conway |
Letter |
PDF |
|
5/23/2000 |
Board re: the Citizens Advisory Board's Request to be Updated on the Acceptance or Rejection of Implementation Plan for 2000-1 |
John T. Conway |
Letter |
PDF |
|
8/12/1994 |
Board re: Status of Overdue Commitments for the 91-6 Implementation Plan |
A. J. Eggenberger |
Letter |
PDF |
|
7/20/1994 |
Board re: Staffing Deficiencies at the Amarillo Area Office |
John T. Conway |
Letter |
PDF |
|
7/13/1994 |
Board re: Specific DOE Reports Relative to Nuclear Safety of the DOE's Defense Facilities |
John T. Conway |
Letter |
PDF |
|
12/23/1999 |
Board re: Seismic Design Spectrum of the Tritium Extraction Facility project at the Savannah River Site |
John T. Conway |
Letter |
PDF |
|
3/29/1991 |
Board re: Savannah River Site Production Reactors - Review of Seismic Design Capability |
John T. Conway |
Letter |
PDF |
|
10/15/1997 |
Board re: Safety Issues on Dynamic Balancing Operations in Building 12-60 at Pantex |
John T. Conway |
Letter |
PDF |
|
10/15/1997 |
Board re: Safety Issues on Dynamic Balancing Operations in Building 12-60 at Pantex |
John T. Conway |
Letter |
PDF |
|
2/1/1996 |
Board re: Revisions to Policy Statement 410.1 |
John T. Conway |
Letter |
PDF |
|
4/29/1994 |
Board re: Plan for Addressing Issues That Led to the Maintenance Mode and Assess Efforts to Resume Operations at Zone 12 at Pantex |
John T. Conway |
Letter |
PDF |
|
9/12/1997 |
Board re: Lightning Protection at Pantex |
John T. Conway |
Letter |
PDF |
|
10/27/1992 |
Board re: Inquiries and Discussions between the DOE and the Board in Reference to the Current Status of Several Board Recommendations (90-1, 91-1, 91-2, 92-1, and 92-3) |
John T. Conway |
Letter |
PDF |
|
5/30/2000 |
Board re: Hydrogen Fluoride Suppy System at the Oak Ridge Y-12 Plant |
John T. Conway |
Letter |
PDF |
|
5/15/1996 |
Board re: Highly Enriched Uranium Processing at the Oak Ridge Y-12 Plant |
John T. Conway |
Letter |
PDF |