Recent Board Activity

Date Title Author Typesort icon Download
2/14/2005 Fire Response Procedures, Hanford Plutonium Finishing Plant John T. Conway Staff Issue Report application/pdf iconPDF
9/7/2005 Demonstration Bulk Vitrification Project, Hanford Tank Farms A.J.Eggenberger Staff Issue Report application/pdf iconPDF
4/24/2006 Review of Activity Level Work Planning and Control by Fluor Hanford, Inc. A.J.Eggenberger Staff Issue Report application/pdf iconPDF
4/29/2008 Review of Activity-Level Work Planning and Control, Hanford Site Tank Farms A.J.Eggenberger Staff Issue Report application/pdf iconPDF
6/24/2008 Fire Protection for the Final Exhaust High Efficiency Particulate Air Filters of the Waste Treatment and Immobilization Plant Confinement Ventilation Systems A.J.Eggenberger Staff Issue Report application/pdf iconPDF
7/15/2008 Corrective Actions for Emergency Management, Tank S-102 Spill at the Hanford Site A.J.Eggenberger Staff Issue Report application/pdf iconPDF
9/17/2008 Maintenance Management at Hanford Tank Farms A.J.Eggenberger Staff Issue Report application/pdf iconPDF
9/17/2008 Review of Electrical Systems, Plutonium Finishing Plant and Tank Farms, at the Hanford Site A.J.Eggenberger Staff Issue Report application/pdf iconPDF
10/30/2008 Activity-Level Work Planning for the River Corridor Closure Project, Hanford Site A.J.Eggenberger Staff Issue Report application/pdf iconPDF
12/2/2009 Structural Steel Analysis and Design, Waste Treatment Plant John E. Mansfield Staff Issue Report application/pdf iconPDF
1/6/2010 Inadequate Mixing. at the Waste Treatment and Immobilization Plant John E. Mansfield Staff Issue Report application/pdf iconPDF
3/12/2010 Activity-Level Work Planning, Hanford Tank Farms John E. Mansfield Staff Issue Report application/pdf iconPDF
8/5/2010 Hanford Tank Farms Documented Safety Analysis Peter S. Winokur Staff Issue Report application/pdf iconPDF
8/26/2010 Technical Basis for Estimating Deposition Velocities, Hanford Site Peter S. Winokur Staff Issue Report application/pdf iconPDF
9/23/2010 Activity-Level Work Planning, Hanford Plateau Remediation Contractor Peter S. Winokur Staff Issue Report application/pdf iconPDF
2/25/2011 Activity-Level Work Planning, Washington Closure Hanford, Hanford Site Peter S. Winokur Staff Issue Report application/pdf iconPDF
4/22/1998 Review of Worker Protection at the Idaho National Engineering and Environmental Laboratory (INEEL) Chemical Processing Plant (CPP) John T. Conway Staff Issue Report application/pdf iconPDF
12/22/1998 Advanced Mixed Waste Treatment Project at Idaho National Engineering and Environmental Laboratory John T. Conway Staff Issue Report application/pdf iconPDF
1/11/2000 Review of Work Planning at Idaho Engineering and Environmental Laboratory John T. Conway Staff Issue Report application/pdf iconPDF
10/2/2001 Review of Facility Evaluation Board Findings, Emergency Preparedness, Waste Processing, and Spent Fuel Movement, Idaho National Engineering and Environmental Laboratory John T. Conway Staff Issue Report application/pdf iconPDF
8/26/2010 Technical Basis for Estimating Deposition Velocities, Hanford Site Peter S. Winokur Staff Issue Report application/pdf iconPDF
3/7/2003 Advanced Mixed Waste Treatment Project John T. Conway Staff Issue Report application/pdf iconPDF
1/19/1995 Report on the Radioactive Air Monitoring Programs at the Savannah River Site F Canyon and FB-Line George W. Cunningham Staff Issue Report application/pdf iconPDF
5/1/2008 Summary of Structural Design Reviews for Integrated Waste Treatment Unit A.J.Eggenberger Staff Issue Report application/pdf iconPDF
3/23/2009 Activity-Level Work Planning, Idaho Cleanup Project A. J. Eggenberger Staff Issue Report application/pdf iconPDF
12/5/1997 Observations on the Capabilities Maintenance and Improvement Project at the Los Alamos National Laboratory, John T. Conway Staff Issue Report application/pdf iconPDF
8/15/1997 Review of Draft Preliminary Hazard Analysis (PHA) for the Capability Maintenance and Improvement Project (CMIP) at Los Alamos National Laboratory (LANL) John T. Conway Staff Issue Report application/pdf iconPDF
1/13/1998 Work Authorization and Work Control Review at the Los Alamos National Laboratory (LANL) Chemistry and Metallurgy Research (CMR) Facility John T. Conway Staff Issue Report application/pdf iconPDF
6/3/1998 Work Smart Standards as an Input to Integrated Safety Management System Development at Los Alamos National Laboratory John T. Conway Staff Issue Report application/pdf iconPDF
9/21/1998 Seismic Investigations and Seismic Design Criteria at Los Alamos National Laboratory John T. Conway Staff Issue Report application/pdf iconPDF
1/15/1999 Technical Project Management of Upgrades to Nuclear Facilities at Los Alamos National Laboratory (LANL) John T. Conway Staff Issue Report application/pdf iconPDF
7/26/1999 Review of Worker Protection at Los Alamos National Laboratory John T. Conway Staff Issue Report application/pdf iconPDF
12/1/1999 Review of Transportation Basis for Interim Operations Module at the Pantex Plant John T. Conway Staff Issue Report application/pdf iconPDF
5/6/1999 Observation of First Waste Receipt and Disposal Placement at Waste Isolation Pilot Plant John T. Conway Staff Issue Report application/pdf iconPDF
12/14/1999 Review of Progress on Implementation of Recommendation 94-1 at Los Alamos National Laboratory John T. Conway Staff Issue Report application/pdf iconPDF
12/21/1999 Recommendation 97-2, Criticality Safety John T. Conway Staff Issue Report application/pdf iconPDF
5/3/2004 Authorization Basis for the Waste Isolation Pilot Plant Mobile Characterization Units John T. Conway Staff Issue Report application/pdf iconPDF
9/22/2010 Electrical System and Electrical Safety Program, Waste Isolation Pilot Plant Peter S. Winokur Staff Issue Report application/pdf iconPDF
3/2/2000 Verification Review of Integrated Safety Management System at Los Alamos National Laboratory John T. Conway Staff Issue Report application/pdf iconPDF
3/2/2000 Authorization Basis Quality Review at the Los Alamos National Laboratory John T. Conway Staff Issue Report application/pdf iconPDF
5/24/2000 Recovery of Los Alamos National Laboratory from Cerro Grande Fire John T. Conway Staff Issue Report application/pdf iconPDF
7/10/2000 Review of Worker Protection at Los Alamos National Laboratory John T. Conway Staff Issue Report application/pdf iconPDF
10/22/2010 Activity-Level Work Planning and Execution, Waste Isolation Pilot Plant Peter S. Winokur Staff Issue Report application/pdf iconPDF
8/29/2000 Flood Mitigation Measures at Los Alamos National Laboratory John T. Conway Staff Issue Report application/pdf iconPDF
7/10/1997 Review of H-Canyon Electrical and Fire Protection Systems, May 28–30, 1997 John T. Conway Staff Issue Report application/pdf iconPDF
1/22/2001 Design and Construction Projects for Defense Nuclear Facilities, Los Alamos National Laboratory John T. Conway Staff Issue Report application/pdf iconPDF
1/26/2001 Authorization Bases at Los Alamos National Laboratory John T. Conway Staff Issue Report application/pdf iconPDF
3/29/2001 Review of Tritium Operations and Emergency Hazard Assessment at Los Alamos National Laboratory John T. Conway Staff Issue Report application/pdf iconPDF
8/13/1998 Reviews of Savannah River Site High-Level Waste Tank Farms and H-Canyon, July 6–8, 1998 John T. Conway Staff Issue Report application/pdf iconPDF
7/10/1998 Americium/Curium Solution Stabilization at the Savannah River Site John T. Conway Staff Issue Report application/pdf iconPDF