Recent Board Activity

Date Title Author Type Download
3/9/1994 DOE Forwards Annual Report for Calendar Year 1993 Hazel R. O'Leary Letter application/pdf iconPDF
3/3/1994 DOE Operational Readiness Evaluation (ORE) for the W79 Preparation for Disposal (PFD) Operations (February 1-4, 1994) John T. Conway Staff Issue Report application/pdf iconPDF
2/28/1994 Report on Liquid and Gaseous Effluent at the Y-12 Plant, December 1-3, 1993. John T. Conway Staff Issue Report application/pdf iconPDF
2/28/1994 DOE re: Implementing Interim Measures for Individual Development Plans (IDPs) under the 93-3 Implementation Plan. Archer L. Durham Letter application/pdf iconPDF
2/28/1994 DOE Deliverables under the 93-1 Implementation Plan, Regarding Orders and Directives Covering Nuclear Explosive Assembly, Disassembly, and Test Operations at Pantex and NTS Rear Admiral Charles J. Beers, Jr. Letter application/pdf iconPDF
2/28/1994 DOE Order Compliance Special Assessment at TA-55 Donald F. Knuth Letter application/pdf iconPDF
2/23/1994 DOE 93-5 Implementation Plan, Which Incorporates Final Comments and Corrections Thomas P. Grumbly Letter application/pdf iconPDF
2/15/1994 Report of a Trip to the Savannah River Site F-Canyon Facility, February 9-11, 1994 DNFSB Staff Issue Report application/pdf iconPDF
2/10/1994 Fourth Annual Report to Congress John T. Conway Report to Congress application/pdf iconPDF
2/9/1994 DOE re: Concerns about the Adequacy of the Order Compliance Assessment Program at LANL Tara O'Toole Letter application/pdf iconPDF
2/7/1994 Savannah River Site (SRS) Replacement Tritium Facility (RTF) Emergency Preparedness and Radiation Protection Follow-up Review DNFSB Staff Issue Report application/pdf iconPDF
2/4/1994 Trip Report - Savannah River Site, F-Canyon Facility, January 26-28, 1994 DNFSB Staff Issue Report application/pdf iconPDF
2/3/1994 Application of the Draft Plutonium Storage Standard to Building 707 Resumption DNFSB Staff Issue Report application/pdf iconPDF
2/2/1994 Trip Report on Sandia National Laboratory (SNL) Review of Reservoir Loading and Welding at the Savannah River Site (SRS) Replacement Tritium Facility (RTF), January 5-7, 1994 DNFSB Staff Issue Report application/pdf iconPDF
2/2/1994 DOE Accepts Board Recommendation 93-6 Hazel R. O'Leary Letter application/pdf iconPDF
2/1/1994 DNFSB Staff Observations On Order Compliance at the Mound Plant John T. Conway Staff Issue Report application/pdf iconPDF
2/1/1994 Conduct of Operations and Training and Qualification Reyiew at the Idaho Chemical Processing Plant, December 13-16, 1993 John T. Conway Staff Issue Report application/pdf iconPDF
2/1/1994 Trip Report on Ventilation/Filtration Systems in Buildings 371, 707 and 771 at the Rocky Flats Plant John T. Conway Staff Issue Report application/pdf iconPDF
1/31/1994 Y-12 - Safety Analyses/Criticality/Chemical Safety Review (November 3-5, 1993) DNFSB Staff Issue Report application/pdf iconPDF
1/31/1994 DOE Interim Report on Technical Qualification for the 93-3 Implementation Plan Archer L. Durham Letter application/pdf iconPDF
1/31/1994 Savannah River Site (SRS) - Canyon Process Vessel Integrity Trip Report (January 18-19, 1994) DNFSB Staff Issue Report application/pdf iconPDF
1/30/1994 DOE Memo Forwarding DOE January 6, 1994, Response to Board November 4, 1993, Letter re: Conduct of Operations at the Pantex Plant Victor Stello, Jr. Letter application/pdf iconPDF
1/27/1994 Los Alamos National Laboratory (LANL), Radiation Protection Review, November 15-18, 1993 John T. Conway Staff Issue Report application/pdf iconPDF
1/27/1994 Los Alamos National Laboratory TA-55 , Training and Qualification and Conduct of Operations Review, November 17-18, 1993. John T. Conway Staff Issue Report application/pdf iconPDF
1/27/1994 Review of K-Basins at Hanford John T. Conway Staff Issue Report application/pdf iconPDF
1/21/1994 DOE Forwards the Recommendation 93-5 Implementation Plan Hazel R. O'Leary Letter application/pdf iconPDF
1/14/1994 Report on Review of Order Compliance at the Savannah River Site (SRS) HB-Line DNFSB Staff Issue Report application/pdf iconPDF
1/10/1994 Trip Report for Staff Visit to the Savannah River Site (SRS) Replacement Tritium Facility (RTF), December 8-10, 1993 DNFSB Staff Issue Report application/pdf iconPDF
1/10/1994 Trip Report for Staff Visit to the Savannah River Site (SRS) Replacement Tritium Facility (RTF), December 8-10, 1993 DNFSB Staff Issue Report application/pdf iconPDF
12/30/1993 DOE Forwards the Fourth Quarterly Status Re[prt per ther 92-2 Implementation Plan Donald W. Pearman Jr. Letter application/pdf iconPDF
12/29/1993 Board Letter on Plutonium Operations at Los Alamos National Laboratory in Support of the Cassini Program John T. Conway Letter application/pdf iconPDF
12/29/1993 Savannah River Site (SRS) - High-Level Waste (HLW) System Review Trip Report (December 6-8, 1993) David C. Lowe Staff Issue Report application/pdf iconPDF
12/27/1993 Board Staff Trip Report on Order Compliance Observations at Oak Ridge John T. Conway Letter application/pdf iconPDF
12/23/1993 Pantex Site - Nuclear Explosive Safety Study (NESS) for the W48 Dimethyl Sulfoxide (DMSO) Dissolution Process (November 30 December 3, 1993) John T. Conway Staff Issue Report application/pdf iconPDF
12/22/1993 Savannah River Site (SRS) H-Tank Farm and In-Tank Precipitation Facility - Trip Report (November 22-23, 1993) Daniel G. Ogg Staff Issue Report application/pdf iconPDF
12/17/1993 Pantex Site - DNFSB Staff Trip Report - Emergency Preparedness Exercise Review DNFSB Staff Issue Report application/pdf iconPDF
12/16/1993 DOE Forwards the Quarterly Status Report per ther 93-2 Implementation Plan Victor H. Reis Letter application/pdf iconPDF
12/16/1993 Trip Report on Configuration Management, Maintenance, and Inspection at F Canyon/FB Line of Savannah River Site Herbert W. Massie Staff Issue Report application/pdf iconPDF
12/15/1993 Savannah River Site (SRS) - Separations Chemical Processing Review Trip Report (December 8-9, 1993) David C. Lowe Staff Issue Report application/pdf iconPDF
12/10/1993 Maintaining Access to Nuclear Weapons Expertise in the Defense Nuclear Facilities Complex John T. Conway Recommendation application/pdf iconPDF
12/10/1993 Board Forwards Recommendation 93-6 John T. Conway Letter application/pdf iconPDF
12/9/1993 DOE Requests 45-Day Extension to Prepare the 93-5 Implementation Plan Hazel R. O'Leary Letter application/pdf iconPDF
12/8/1993 Board Letter Regarding Staff Trip Report to Nevada Test Site and Pantex Plant John T. Conway Letter application/pdf iconPDF
12/7/1993 Report of Trip to Y-12 Plant A. K. Gwal Staff Issue Report application/pdf iconPDF
12/7/1993 Report on Review of Order Compliance at the Savannah River Site (SRS) HB-Line Conducted November 30 - December 1, 1993 Paul F. Gubanc Staff Issue Report application/pdf iconPDF
12/3/1993 Board Staff Trip Report on West Valley Demonstration Project (October 6-8, 1993) Daniel G. Ogg Staff Issue Report application/pdf iconPDF
12/1/1993 Defense Waste Processing Facility (DWPF) Site Visit, September 1-3, 1993. A. K. Gwal Staff Issue Report application/pdf iconPDF
11/24/1993 Board Letter to Congress Describing Aim of Recommendation 93-3 John T. Conway Letter application/pdf iconPDF
11/23/1993 Report on Spent Fuel Storage Basins Dan Burnfield Staff Issue Report application/pdf iconPDF
11/23/1993 Report on Review of DOE Savannah River Site Facility Representatives Conducted November 8 - 9, 1993 Paul F. Gubanc Staff Issue Report application/pdf iconPDF