|
5/12/2003 |
Board Request for Briefing on the Results of the DynEx Project Review of Control Hazards and Facility Utilization at Los Alamos National Laboratory |
John T. Conway |
Letter |
PDF |
|
3/31/2003 |
Board Request for Notification of Delays in Scheduled Completion of Fire Safety Improvement Projects at Los Alamos National Laboratory |
John T. Conway |
Letter |
PDF |
|
1/24/2003 |
Board Issues a Reporting Requirement for a Report within 30 Days that Documents How DOE Plans to Address Hazards and Implement the Safety Improvements of Defunded Safety-Related Action Plans |
John T. Conway |
Letter |
PDF |
|
1/16/2003 |
Board Acknowledges Efforts of Mary Ann Rosenthal in Coordinating the Interface between the Board and the Los Alamos National Laboratory |
John T. Conway |
Letter |
PDF |
|
12/15/2000 |
Design and Construction of Los Alamos Experimental Confinement and Safety Vessels |
John T. Conway |
Letter |
PDF |
|
3/8/2005 |
Board Issues a Reporting Requirement for a Report (Prior to Resumption)from NNSA on the Path Forward for Resumption of Programmatic Operations at Plutonium Facility |
John T. Conway |
Letter |
PDF |
|
11/3/2004 |
Board Issues a Reporting Requirement for a Report within 60 Days Addressing Vital Safety Systems and a Resource-Loaded Schedule Implementing Management Program |
John T. Conway |
Letter |
PDF |
|
1/14/2000 |
Board Acknowledges Dr. Charles Carrigan's Efforts in Helping to Make David Ralston's Third-Year Internship Assignment a Success |
John T. Conway |
Letter |
PDF |
|
7/28/2009 |
Board Issues a Reporting Requirement for a Briefing in October, 2009, on Modification or Upgrades Planned for the Fire Suppression System to Provide Safety-Related Function at the Device Assembly Facility, Nevada Test Site |
A. J. Eggenberger |
Letter |
PDF |
|
2/4/2011 |
Board Issues a Reporting Requirement for a Report and Subsequent Briefing within 90 Days Addressing Y-12 Contractor's Change in Approach on non-MAA Materials in Building 9720-5 |
Peter S. Winokur |
Letter |
PDF |
|
10/1/2010 |
Board Acknowledges Correspondence Dated August 16, 2010, Regarding the Safe, Secure Storage of Uranium-233 at Oak Ridge National Laboratory and the Board's Closure of Recommendation 97-1 |
Peter S. Winokur |
Letter |
PDF |
|
4/22/2010 |
Board Congratulates DOE, NNSA, and the Y-12 Contractors on the Completion of the Highly Enriched Uranium Materials Facility at the Y-12 National Security Complex |
Peter S. Winokur |
Letter |
PDF |
|
2/6/2008 |
Board Issues a Reporting Requirement for a Report and Briefing within 90 Days Describing NNSA's Plans for Improving Reliability of the Water Supply at the Highly Enriched Uranium Materials Facility at the Y-12 National Security Complex |
A. J. Eggenberger |
Letter |
PDF |
|
1/17/2008 |
Board Issues a Reporting Requirement for a Briefing within 90 Days on NNSA's Plans to Clarify the Appropriate Use of Bounding Release Fractions for Accident Analyses at Y-12 and Plans for Applying this Methodology to Existing and Planned Facilities |
A. J. Eggenberger |
Letter |
PDF |
|
8/9/2007 |
Conceptual Design Activities at the Uranium Processing Facility, Y-12 National Security Complex |
A. J. Eggenberger |
Letter |
PDF |
|
3/13/2007 |
Board Issues a Reporting Requirement for a Report and Briefing within 6 Months for NNSA to Address Adequacy of the 9212 Complex to Support Safe Operations, with Annual Report and Briefing on UPF and 9212 Complex; Annual Report within 1 Year |
A. J. Eggenberger |
Letter |
PDF |
|
9/7/2006 |
Ground Motion Criteria and Structural Engineering Issues at the Waste Treatment and Immobilization Plant |
A. J. Eggenberger |
Letter |
PDF |
|
3/1/2006 |
Congratulations to William J. Brumley, Manager, NNSA Y-12 Site Office, on the Occaision of His Retirement |
A. J. Eggenberger |
Letter |
PDF |
|
11/28/2005 |
Board Issues a Reporting Requirement for a Report within 60 Days on the Completion of Risk Prioritization Activity with Facility Modifications Should the UPF Milestones be Delayed |
A. J. Eggenberger |
Letter |
PDF |
|
11/13/2002 |
Board Issues a Reporting Requirement for a Response within 60 Days by DOE/NNSA/DP and the Y-12 Contractor Addressing Criticality Safety for Operations in Building 9212 |
John T. Conway |
Letter |
PDF |
|
7/30/2002 |
Progress of the Request for Proposal (RFP) for Obtaining Medical Isotopes from the Uranium-233 Stored at Oak Ridge National Laboratory and Shutdown of Building 3019 Complex |
John T. Conway |
Letter |
PDF |
|
1/18/2002 |
Board Concerns with DOE and DOE-SC Developing a Coherent and Prioritized Plan and Not Aggressively Pursuing the Actions Necessary to Establish and Control the Safety Bases for Hazardous Nuclear Activities |
John T. Conway |
Letter |
PDF |
|
10/15/2001 |
Board Issues Reporting Requirement that DOE Provide a Report withing 45 Days for Independent Assessment of the Adequacy of the Authorization Basis and Safety Posture for each of Bechtel Jacobs Company's Defense Nuclear Facilities |
John T. Conway |
Letter |
PDF |
|
9/6/2001 |
Preparations for the Phase I Uranium-233 Inspection and Repackaging Program at the Oak Ridge National Laboratory |
John T. Conway |
Letter |
PDF |
|
12/18/2009 |
Board Commends Mr. Frank Lessing of Boeing Research and Technology for his Outstanding Contribution to the Board's Oversight of the DOE's Nuclear Work at the Pantex Plant |
John E. Mansfield |
Letter |
PDF |
|
12/7/2009 |
Board Commends Dr. Richard S. Hartley of B&W Pantex for his Seminar on High-Reliability Organizations |
John E. Mansfield |
Letter |
PDF |
|
10/15/2009 |
Issues Related to the Development and Implementation of Technical Procedures at the Pantex Plant |
John E. Mansfield |
Letter |
PDF |
|
8/8/2008 |
Board Issues a Reporting Requirement that NNSA Provide a Briefing Prior to Resumption of W76 Operations |
A. J. Eggenberger |
Letter |
PDF |
|
3/20/2008 |
Board Issues a Reporting Requirement for a Briefing from NNSA within 60 Days Describing the Risks Associated with Each of the Dismantlement Strategies Being Considered for the B53 Weapon System |
A. J. Eggenberger |
Letter |
PDF |
|
4/24/2007 |
Board Issues a Reporting Requirement for a Briefing from NNSA within 30 Days on NNSA's Assessment of the Quality of Technical Procedures for Nuclear and Nuclear Explosive Operations at Pantex |
A. J. Eggenberger |
Letter |
PDF |
|
3/30/2007 |
Board Issues a Reporting Requirement for a Briefing from NNSA within 30 Days on Direct and Indirect Lightning Effects at Pantex |
A. J. Eggenberger |
Letter |
PDF |
|
12/15/2006 |
Thanks and Appreciation to Michael Reaka for Six Years of Dedicated Service as the Pantex Site Office's Liaison to the Board |
A. J. Eggenberger |
Letter |
PDF |
|
12/15/2006 |
Board Requests that NNSA Provide a Completion Date for the Final Assessment Report (DOE Commitment 4 .5.1) Recommendation 98-2 |
A. J. Eggenberger |
Letter |
PDF |
|
8/16/2006 |
Board Issues a Reporting Requirement for a Briefing within 30 Days on NNSA's Path Forward to Fulfill Commitment 4.2.2 of the Implementation Plan for Recommendation 98-2 |
A. J. Eggenberger |
Letter |
PDF |
|
8/9/2006 |
Potential Safety Issues in Evaluation of Exemption Request for W88 Cell Operations at Pantex |
A. J. Eggenberger |
Letter |
PDF |
|
12/14/2005 |
Board Issues a Reporting Requirement for a Report within 30 Days Providing a Path Forward for Required Guidance on Technical Business Practice |
A. J. Eggenberger |
Letter |
PDF |
|
9/9/2005 |
Board Issues a Reporting Requirement for Annual Briefing Coincident with the Annual Update for the Pantex Pit Management Plan and Accepts Final Report on Recommendation 99-1 |
A. J. Eggenberger |
Letter |
PDF |
|
6/23/2005 |
Questions Raised Concerning Safety Issues and Procedures at Pantex Plant by Production Technicians |
A. J. Eggenberger |
Letter |
PDF |
|
5/2/2005 |
Board Issues a Reporting Requirment for a Briefing within 30 Days on the NNSA's Path Forward to Improve Conduct of Operations at the Pantex Plant |
A. J. Eggenberger |
Letter |
PDF |
|
12/15/2004 |
Board Issues a Reporting Requirement for NNSA to Provide a Report within 30 Days on the Impact of Tooling Problems on the Safety of Nuclear Explosive Operations at the Pantex Plant |
John T. Conway |
Letter |
PDF |
|
12/14/2004 |
Board Issues a Reporting Requirement for Monthly Briefing from Senior NNSA Managers on the Status of Commitments under the Recommendation 98-2 Implementation Plan |
John T. Conway |
Letter |
PDF |
|
1/20/2004 |
Board Issues a Reporting Requirment for a Comprehensive Report within 30 Days Documenting a Root-Cause Analysis of Cracked High Explosive Discovered During Weapon Dismantlement |
John T. Conway |
Letter |
PDF |
|
7/9/2003 |
Board Issues a Reporting Requirement for Briefing by DOE on the Recovery Schedule for Accelerated implementation of SS-21 Tooling for W88 Bay Operations |
John T. Conway |
Letter |
PDF |
|
7/9/2003 |
Board Issues a Reporting Requirement for a Report within 30 Days Describing Training Assessments under DOE Order 5480.20A at Pantex |
John T. Conway |
Letter |
PDF |
|
3/25/2003 |
Board Issues a Reporting Requirement for NNSA to Provide a Report within 30 Days on Action to Improve Software Quality Assurance for Interactive Electronic Procedures and the Move Right System |
John T. Conway |
Letter |
PDF |
|
12/19/2002 |
Board Accepts DOE's Implementation Plan for Recommendation 98-2 |
John T. Conway |
Letter |
PDF |
|
11/13/2002 |
Board Issues a Reporting Requirement for a Briefing from NNSA within 30 Days on Safety-Significant Designation for Continuous Air and Radiation Alarm Monitors |
John T. Conway |
Letter |
PDF |
|
8/1/2002 |
Board Issues a Reporting Requirement for NNSA Briefing in 30 Days on Action Taken to Ensure Support of the National Laboratories, the Design Agencies for Nuclear Explosives |
John T. Conway |
Letter |
PDF |
|
5/8/2002 |
Board Accepts DOE Revision to the Implementation Plan for Recommendation 99-1 and DOE May Cease Providing Quarterly Reports on Commitment 5.2.2 |
John T. Conway |
Letter |
PDF |
|
10/2/2001 |
Board Issues a Reporting Requirement for DOE to Provide a Briefing within 30 Days Containing Details on Procedural Compliance Issues at Pantex and the Corrective Actions Proposed by DOE |
John T. Conway |
Letter |
PDF |