Letters

Datesort ascending Title Document Type Document
July 18, 2012 Board Issues a Reporting Requirement Concerning Seismic/Structural Analysis at the Plutonium Facility, Los Alamos National Laboratory Letter PDF iconPDF
July 13, 2012 DOE Response to Board June 18, 2012, Letter Concerning the Plutonium Facility at the Los Alamos National Laboratory (LANL) Letter PDF iconPDF
June 11, 2012 Board Issues a Reporting Requirement for a Report Identifying Actions Taken or Planned by the NNSA to Resolve Safety Issues Relating to the Transuranic Waste Facility (TWF) Project at Los Alamos National Laboratory (LANL) Letter PDF iconPDF
March 20, 2012 DOE Letter Informing the Board that DOE has Completed Deliverable 5.4.4 of the Implementation Plan (IP) for Recommendation 2009-2, Los Alamos National Laboratory, Plutonium Facility Seismic Safety Letter PDF iconPDF
January 30, 2012 DOE Explanation of its Conclusion that Operations at Los Alamos National Laboratory's Plutonium Facility (PF-4) Adequately Protect Public Safety Letter PDF iconPDF
November 18, 2011 DOE Fulfills February 28, 2011, Commitment to Board that the National Nuclear Security Administration (NNSA) Would Inform the Board Concerning Proposals for Reducing Costs of the Chemistry and Metallurgy Research Building Replacement (CMRR) Project Letter PDF iconPDF
November 15, 2011 DOE Letter Informing the Board that DOE has Completed Deliverable 5.2.3 of the Implementation Plan (IP) for Board Recommendation 2009-2 Letter PDF iconPDF
October 5, 2011 DOE Letter Providing a Report Dated September 29, 2011, Describing Planned Actions to Address Issues with the System for Analysis of Soil-Structure Interaction (SASSI) Computer Code Letter PDF iconPDF
September 29, 2011 DOE Letter Informing the Board that the DOE Will Require Until November 15, 2011, to Complete Deliverable 5.2.3 of the Implementation Plan (IP) for Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety Letter PDF iconPDF
July 20, 2011 DOE Requests 60-Day Extension to Complete Deliverable 5.2.3 of the DOE's Implementation Plan (IP) for Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety Letter PDF iconPDF

Pages