March 31, 2009 |
Board Issues a Reporting Requirement for a Report from DOE within 90 Days for a Revised Implementation Plan on Proposed Dates for Outstanding Commitments for Recommendation 2001-1 |
Letter |
PDF |
March 24, 2009 |
DOE Response to Board February 10, 2009, Letter Regarding Open Issues at the Salt Waste Processing Facility |
Letter |
PDF |
March 5, 2009 |
Board Concerns on Design Activities and Associated Safety Basis Development for the Tank 48 Fluidized Bed Steam Reforming (FBSR) Project at the Savannah River Site |
Letter |
PDF |
February 10, 2009 |
Board Concerns on Final Design Activities and Safety Basis Development for the Salt Waste Processing Facility (SWPF) at the Savannah River Site |
Letter |
PDF |
January 12, 2009 |
Waste Solidification Building Project Summary, Savannah River Site |
Letter |
PDF |
October 8, 2008 |
DOE Request for 30 Day Extension for Briefing to Board Concerning Savannah River Site, re: Board Letter of September 4, 2008 |
Letter |
PDF |
September 22, 2008 |
DOE Letter Responding to the Board's Correspondence Dated June 25, 2008, Concerning the Structural and Geotechnical Design of the Waste Solidification Building at the Savannah River Site |
Letter |
PDF |
May 9, 2008 |
DOE has Completed Commitments 2.10 and 2.13 of the Implementation Plan for Recommendation 2001-1, High-Level Waste Management at the Savannah River Site |
Letter |
PDF |
March 28, 2008 |
DOE Request that the Board Provide a Narrow Technical Review of the Mixed Oxide Fuel Fabrication Facility Aqueous Processing Design with Respect to Whether the Intent of the Findings and Recommendations of DNFSB/TECH-33 have been Adequately Incorporated |
Letter |
PDF |
February 29, 2008 |
DOE Notice of Completion of Recommendation 2001-1 Commitment 2.9, Demonstrate the Viability of the Deliquification, Dissolution, and Adjustment of Implementation Plan |
Letter |