October 22, 1996 |
Review of Residue Processing Title I and II Design at Rocky Flats Environmental Technology Site, October 7-9, 1996 |
Staff Issue Report |
PDF |
October 11, 1996 |
Trip Report on Los Alamos National Laboratory TA-55 Facility Electrical and Ventilation Systems |
Staff Issue Report |
PDF |
October 8, 1996 |
Review of Deactivation and Decommissioning Plans for Buildings 771 and 779 at Rocky Flats Environmental Technology Site, September 17-19, 1996 |
Staff Issue Report |
PDF |
September 23, 1996 |
Review of F- and H-Area High-Level Waste (HLW) Tank Closure at the Savannah River Site |
Staff Issue Report |
PDF |
September 16, 1996 |
Review of Hanford Tank Farms Draft Basis for Interim Operations |
Staff Issue Report |
PDF |
September 5, 1996 |
Review of Operational Readiness for Plutonium-242 Operations at HB-Line, Savannah River Site, August 20-22, 1996 |
Staff Issue Report |
PDF |
September 4, 1996 |
On-Site Review of Electrical Systems at the Rocky Flats Environmental Technology Site |
Staff Issue Report |
PDF |
September 3, 1996 |
Trip Report on the Reconvening of the Nuclear Explosive Safety Study for the Coded Optical Device Enabling System |
Staff Issue Report |
PDF |
August 28, 1996 |
Fire Protection Visit to Rocky Flats Environmental Technology Site, Building 771 (July 31-August 1, 1996) |
Staff Issue Report |
PDF |
August 28, 1996 |
Handling of Spent Nuclear Fuel at the Idaho National Engineering Laboratory (INEL), Trip Report for August 19-23, 1996. |
Staff Issue Report |
PDF |