December 8, 1995 |
Status of Highly Enriched Uranium Processing Capability at Building 9212 Oak Ridge Y-12 Plant |
Technical Report |
PDF |
November 30, 1995 |
Report on the Savannah River Site (SRS) Emergency Preparedness (EP) Defense Waste Processing Facility (DWPF) Site Exercise |
Staff Issue Report |
PDF |
November 29, 1995 |
Review of Hanford Site High-Level Waste Tank Accelerated Safety Analysis and Flammable Gas Safety Issue, November 6-8, 1995 |
Staff Issue Report |
PDF |
November 27, 1995 |
Savannah River Site (SRS) - In-Tank Precipitation (ITP) Review of Cycle 1 Testing (November 8, 1995) |
Staff Issue Report |
PDF |
November 20, 1995 |
Structural Review of the Proposed Canister Storage Building (CSB) at the Hanford Site |
Staff Issue Report |
PDF |
November 20, 1995 |
Board Staff Trip Report on the Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS) |
Staff Issue Report |
PDF |
November 17, 1995 |
Shipping Weapons from Pantex to Department of Defense Facilities to Remove Reservoirs |
Staff Issue Report |
PDF |
November 3, 1995 |
Y-12 Plant: Staff Observations of Department of Energy (DOE) and Lockheed Martin Energy Systems' (LMES) Preparations for Receipt, Storage, and Shipment Restart |
Staff Issue Report |
PDF |
October 20, 1995 |
Structural Review of the Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS) |
Staff Issue Report |
PDF |
October 13, 1995 |
Trip Report on Savannah River Site (SRS) Defense Waste Processing Facility (DWPF) Electrical Systems |
Staff Issue Report |
PDF |