Reports
As of May 2016, the
Board posts Staff Issue Reports and their accompanying transmittal
letters with regular correspondence. Please see the
Letters & Correspondence
section for any reports posted on or after that date.
Date |
Title |
Document Type |
Document |
January 24, 2022 |
Conceptual Design Review of the Savannah River Plutonium Processing Facility |
Staff Issue Report |
PDF |
April 21, 2016 |
Savannah River Site Nuclear Criticality Safety Program |
Staff Issue Report |
PDF |
January 13, 2016 |
Tritium Extraction Facility Safety Basis Review |
Staff Issue Report |
PDF |
December 22, 2015 |
Emergency Preparedness and Response at the Savannah River Site |
Staff Issue Report |
PDF |
September 25, 2015 |
H-Canyon Seismic Performance and Condition |
Staff Issue Report |
PDF |
July 28, 2015 |
SRS L-Area Safety Basis |
Staff Issue Report |
PDF |
May 1, 2015 |
Defense Waste Processing Facility (DWPF) Safety Basis Review |
Staff Issue Report |
PDF |
March 13, 2012 |
Review of A- and K-Area Fire Water Supplies, Savannah River Site |
Staff Issue Report |
PDF |
March 9, 2012 |
Activity-Level Work Planning and Control, Savannah River Nuclear Solutions |
Staff Issue Report |
PDF |
August 11, 2011 |
Report of a Trip to the Savannah River Site (SRS) Concerning Supplementary Safety System (SSS) Design Adequacy and Other Topics (File Reference - SSSRPT) |
Staff Issue Report |
PDF |
Pages