Board Establishes a 30-Day Reporting Requirement on Criteria for Packaging and Storing Uranium-233 Bearing Materials |
Download |
INEEL Final Site Assessment Report on the Storage of Uranium-233 per ther 97-1 Implementation Plan |
Download |
DOE Implementation Plan Will Meet the Underlying Safety Improvement Objectives of Recommendation 2010-1. Responsible Manager is Dr. James O'Brien, Acting Director, Office of Nuclear Safety |
Download |
DOE Response to Board Letter Dated November 2, 1999, on the Review of Ventilation Systems in Building 3019 Used for Safe Operations and Long Term Storage for Uranium-233 at the Oak Ridge National Laboratory |
Download |
DOE Delay in Schedule for the Inspection and Repackaging Program Activities Involving Uranium-233 Inventory in Building 3019, Oak Ridge |
Download |
DOE Responds to Board Letter Dated February 28, 2003 Regarding Proposed Changes to Existing DOE Safety Orders and Other Standards |
Download |
DOE Responding to Board Letter Dated August 30, 2000, on the Preparations for the Resumption of the Enriched Uranium Reduction Process at the Y-12 Plant |
Download |
Status of Two Savannah River Site Commitments, Packaging of Plutonium Metal and Disposition of Pre-Existing High-Enriched Uranium Solutions, in Revision 2 of the 2000-1 Implementation Plan |
Download |
DOE Responds to Board Letter Dated February 14, 2003 Regarding Suspect/Counterfeit Items in Safety-Related or Mission-Sensitive Applications |
Download |
DOE Informs the Board of the Shipments of Depleted Uranium Material from Savannah River Site to Envirocare of Utah |
Download |