|
7/27/2010 |
Peter S. Winokur |
D. Pethic |
Request to Ensure that Material Information is Preserved from Alteration or Destruction so that the Board has the Opportunity to Exercise its Statutory Investigative Authority Concerning Health and Safety Concerns at WTP, Hanford Site |
Letter |
PDF |
|
7/16/2010 |
Peter S. Winokur |
I. R. Triay |
Hydrogen in Pipes and Ancillary Vessels (HPAV) Independent Review Team (HIRT) |
Letter |
PDF |
|
5/5/2010 |
Peter S. Winokur |
I. R. Triay |
Board Issues a Reporting Requirement Concerning Response to Quality Assurance and Safety Concerns at the Waste Treatment Plant, Hanford Site |
Letter |
PDF |
|
1/8/2009 |
A. J. Eggenberger |
I. R. Triay |
Fire Protection Coating on Structural Steel Used in the Construction of the Hanford Waste Treatment and Immobilization Plant, Hanford Site |
Letter |
PDF |
|
6/11/2008 |
A. J. Eggenberger |
Samuel W. Bodman |
2007 Department of Energy Facility Representative of the Year, Glyn Trenchard |
Letter |
PDF |
|
9/7/2006 |
A. J. Eggenberger |
James A. Rispoli |
Ground Motion Criteria and Structural Engineering Issues of the Waste Treatment and Immobilization Plant, Hanford Site |
Letter |
PDF |
|
1/5/2006 |
A. J. Eggenberger |
Samuel W. Bodman |
Sludge Stabilization and Packaging System at the K-Basins, Hanford Site |
Letter |
PDF |
|
10/17/2005 |
A. J. Eggenberger |
Samuel W. Bodman |
Review of the Design and Construction of the Waste Treatment Plant, Hanford Site |
Letter |
PDF |
|
4/19/2005 |
A. J. Eggenberger |
Paul M. Golan |
Interim Seismic Criteria for the Waste Treatment Plant, Hanford Site |
Letter |
PDF |
|
1/18/2005 |
John T. Conway |
Paul M. Golan |
Board issues a Reporting Requirement for Report and Briefing within 45 days Concerning the High Level Waste Tank Integrity Program |
Letter |
PDF |