Letters and Correspondence

Signed Fromsort icon To Title Type Download
6/11/2008 A. J. Eggenberger Samuel W. Bodman 2007 Department of Energy Facility Representative of the Year, Glyn Trenchard Letter application/pdf iconPDF
9/7/2006 A. J. Eggenberger James A. Rispoli Ground Motion Criteria and Structural Engineering Issues of the Waste Treatment and Immobilization Plant, Hanford Site Letter application/pdf iconPDF
1/5/2006 A. J. Eggenberger Samuel W. Bodman Sludge Stabilization and Packaging System at the K-Basins, Hanford Site Letter application/pdf iconPDF
10/17/2005 A. J. Eggenberger Samuel W. Bodman Review of the Design and Construction of the Waste Treatment Plant, Hanford Site Letter application/pdf iconPDF
4/19/2005 A. J. Eggenberger Paul M. Golan Interim Seismic Criteria for the Waste Treatment Plant, Hanford Site Letter application/pdf iconPDF
7/15/2008 A. J. Eggenberger Samuel W. Bodman DOE's Fernald Site is No Longer Operating Letter application/pdf iconPDF
7/28/2009 A. J. Eggenberger Thomas P. D'Agostino Deficiencies in the Vault Water Bath System at Los Alamos National Laboratory Letter application/pdf iconPDF
7/7/2009 A. J. Eggenberger Joni Arends Seismic Issues Raised by Concerned Citizens for Nuclear Safety - CMRR Facility, Los Alamos National Laboratory Letter application/pdf iconPDF
4/7/2009 A. J. Eggenberger Steven Chu Board Issues a 45-Day Reporting Requirement Concerning Immediate Actions/Compensatory Measures Taken, and a 60-Day Reporting Requirement for Plan of Action for Improving Safety Posture Letter application/pdf iconPDF
1/13/2009 A. J. Eggenberger Thomas P. D'Agostino Board Issues Reporting Requirement for DOE to Submit Deliverables within 90 days for Recommendation 2004-2 Implementation Plan Letter application/pdf iconPDF