11/15/1999 |
John T. Conway |
Bill Richardson |
Board Closes Recommendation 93-5, Waste Tanks Characterization |
PDF |
|
10/29/1999 |
Bill Richardson |
John T. Conway |
DOE Proposal to Close Recommendation 93-5 and Enclosure of Justifications for this Proposal |
PDF |
|
10/27/1999 |
Richard T. French |
John T. Conway |
DOE Quarterly Report for July Through September, 1999, on Recommendation 93-5 Implementation Plan |
PDF |
|
9/24/1999 |
Richard T. French |
John T. Conway |
DOE Milestone 5.4.3.6.d for the 93-5 Implementation Plan |
PDF |
|
7/29/1999 |
Richard T. French |
John T. Conway |
DOE Quarterly Report for April-June, 1999, for Recommendation 93-5 Implementation Plan |
PDF |
|
7/8/1999 |
Richard T. French |
John T. Conway |
DOE Milestone 5.6.3.1j for the 93-5 Implementation Plan |
PDF |
|
4/29/1999 |
Richard T. French |
John T. Conway |
DOE Quarterly Report for the Recommendation 93-5 Implementation Plan |
PDF |
|
4/15/1999 |
Richard T. French |
John T. Conway |
DOE Milestones 5.4.3.4d, 5.4.3.4e, and 5.4.3.4f for the 93-5 Implementation Plan |
PDF |
|
4/6/1999 |
Richard T. French |
John T. Conway |
DOE Milestone 5.4.3.1.d for the 93-5 Implementation Plan |
PDF |
|
1/29/1999 |
James C. Hall |
John T. Conway |
DOE Milestone 5.4.3.1.D for the 93-5 Implementation Plan |
PDF |
|
1/29/1999 |
James C. Hall |
John T. Conway |
DOE Quarterly Report for the 93-5 Implementation Plan |
PDF |
|
12/28/1998 |
John D. Wagoner |
John T. Conway |
Recommendation 93-5 Implementation Plan Revision 1, Milestone 5.6.3.1i |
PDF |
|
11/25/1998 |
John D. Wagoner |
John T. Conway |
Completion of Milestone 5.4.3.6.c per the 93-5 Implementation Plan |
PDF |
|
10/29/1998 |
John D. Wagoner |
John T. Conway |
Quarterly Status Report for July Through September 1998 per the 93-5 Implementation Plan |
PDF |
|
7/28/1998 |
John D. Wagoner |
John T. Conway |
DOE Forwards the 93-5 Quarterly Report for April through June 1998 |
PDF |
|
7/22/1998 |
John D. Wagoner |
John T. Conway |
DOE Forwards Milestone 5.6.3.1h per the 93-5 Implementation Plan |
PDF |
|
7/17/1998 |
DNFSB |
DOE |
Board Announcement Scheduling a Public Hearing Regarding Recommendation 93-5 on August 5, 1998, 12:30 p.m. |
PDF |
|
4/29/1998 |
John D. Wagoner |
John T. Conway |
Completion of Milestone 5.4.3.1.d per the 93-5 Implementation Plan |
PDF |
|
4/27/1998 |
John D. Wagoner |
John T. Conway |
DOE Quarterly Report for January through March 1998 per the 93-5 |
PDF |
|
3/27/1998 |
John D. Wagoner |
John T. Conway |
Completion of Milestones 5.5.6.1.a and 5.6.3.1.g (Enclosed) per the 93-5 Implementation Plan |
PDF |
|
3/26/1998 |
John D. Wagoner |
John T. Conway |
DOE Informs Board of Delay in Completing Milestone 5.4.3.1.D per the 93-5 Implementation Plan |
PDF |
|
1/27/1998 |
John D. Wagoner |
John T. Conway |
DOE 93-5 Implementation Plan Quarterly Report for October through December 1997 |
PDF |
|
1/7/1998 |
John D. Wagoner |
John T. Conway |
DOE Provides Completion of Milestone 5.4.3.5d for Implementation 93-5 |
PDF |
|
11/14/1997 |
John D. Wagoner |
John T. Conway |
DOE Completion of Milestones for the Revision of the 93-5 Implementation Plan |
PDF |
|
10/31/1997 |
John D. Wagoner |
John T. Conway |
DOE Completion of Milestone 5.6.3.1.f, for the 93-5 Implementation Plan |
PDF |
|
10/3/1997 |
John D. Wagoner |
John T. Conway |
DOE Completion of 93-5 Implementation Plan, Milestone 5.4.3.6.B |
PDF |
|
7/31/1997 |
John D. Wagoner |
John T. Conway |
DOE Quarterly Report, Recommendation 93-5 Implementation Plan for April through June 1997 |
PDF |
|
6/27/1997 |
John D. Wagoner |
John T. Conway |
DOE Completion of Milestone 5.4.3.3.a for the 93-5 Implementation Plan |
PDF |
|
6/13/1997 |
John D. Wagoner |
John T. Conway |
DOE Completion of Milestone 5.4.3.1.d. for the 93-5 Implementation Plan |
PDF |
|
5/27/1997 |
John D. Wagoner |
John T. Conway |
DOE Completion of 93-5 Implementation Plan Milestone 5.4.3.5.1. |
PDF |
|
5/9/1997 |
Sandra L. Trine |
Ralph Arcaro |
DOE Updates for the Historical Tank Content Estimates per the 93-5 Implementation Plan |
PDF |
|
5/2/1997 |
John T. Conway |
Alvin L. Alm |
Review of the Tank Waste Remediation System at the Hanford Site, March 30-ApriI 3, 1997 |
PDF |
|
4/30/1997 |
John D. Wagoner |
John T. Conway |
DOE 93-5 Quarterly Report for January through March 1997 |
PDF |
|
4/4/1997 |
John D. Wagoner |
John T. Conway |
DOE Delays in Completing a 93-5 Implementation Plan Milestone 5.4.3.5.d. |
PDF |
|
3/28/1997 |
John D. Wagoner |
John T. Conway |
DOE Completion of Milestone 5.4.3.5.k for the 93-5 Implementation Plan |
PDF |
|
2/19/1997 |
John T. Conway |
Mark B. Whitaker, Jr. |
Review of Hanford High-Level Waste Tank Safety Issues, December 2-6, 1996 |
PDF |
|
2/10/1997 |
John D. Wagoner |
John T. Conway |
DOE Quarterly Report for the 93-5 Implementation Plan (for the Period October 1 - December 31, 1996) |
PDF |
|
1/31/1997 |
Sandra L. Trine |
Ralph Arcaro |
DOE Reports Delay in Submission of the Quarterly Report (October - December 1996) for the 93-5 Implementation Plan |
PDF |
|
1/30/1997 |
John D. Wagoner |
John T. Conway |
DOE Notifies Board of its Completion of Milestone 5.4.3.5.h for the 93-5 Implementation Plan |
PDF |
|
1/30/1997 |
John D. Wagoner |
John T. Conway |
DOE Notifies Board of the Completion of Milestone 5.4.3.5.f for the 93-5 Implementation Plan |
PDF |
|
1/30/1997 |
John D. Wagoner |
John T. Conway |
DOE Notifies Board of its Completion of Milestone 5.6.3.1c for the 93-5 Implementation Plan |
PDF |
|
12/31/1996 |
John D. Wagoner |
John T. Conway |
DOE Notifies the Board of Late Delivery of Milestone 5.4.3.5.d for the 93-5 Implementation Plan |
PDF |
|
12/31/1996 |
John D. Wagoner |
John T. Conway |
DOE Notifies the Board of a Delay in Completion of Milestone 5.4.3.5.h for the 93-5 Implementation Plan |
PDF |
|
12/30/1996 |
John D. Wagoner |
John T. Conway |
DOE Notifies Board of Completion of Milestone 5.4.3.1.c for the 93-5 Implementation Plan. |
PDF |
|
12/24/1996 |
John D. Wagoner |
John T. Conway |
DOE Completion of Milestone 5.4.3.3.A for the 93-5 Implementation Plan |
PDF |
|
12/24/1996 |
John D. Wagoner |
John T. Conway |
DOE Completion of Milestone 5.4.3.5.1 for the 93-5 Implementation Plan |
PDF |
|
12/23/1996 |
John D. Wagoner |
John T. Conway |
DOE Completion of Milestone 5.4.3.4.C for the 93-5 Implementation Plan |
PDF |
|
12/18/1996 |
S. L. Trine |
Ralph Arcaro |
DOE Forwarding Tank Waste Remediation System Approved Basis for Interim Operations |
PDF |
|
12/18/1996 |
John D. Wagoner |
John T. Conway |
DOE Completion of Milestone 5.4.3.5.j per the 93-5 Implementation Plan |
PDF |
|
12/17/1996 |
Alvin L. Alm |
John T. Conway |
Board Approves the "Assessment of the Potential for Ferrocyanide Propagating Reaction Accidents" Report |
PDF |
|
11/19/1996 |
John D. Wagoner |
John T. Conway |
DOE Confirming Completion of Milestone 5.6.3.1.b for the 93-5 Implementation Plan |
PDF |
|
11/12/1996 |
John D. Wagoner |
John T. Conway |
DOE Confirming Completion of Milestone 5.4.3.5.G per the 93-5 Implementation Plan |
PDF |
|
11/4/1996 |
John D. Wagoner |
John T. Conway |
DOE Quarterly Report (for the Period July 1 - September 30, 1996) for the 93-5 Implementation Plan |
PDF |
|
10/31/1996 |
John D. Wagoner |
John T. Conway |
DOE Reporting Approval of Safety Assessment for Saltwell Pumping in Flammable Gas Tanks, Milestone 5.4.3.5.e for the 93-5 Implementation Plan |
PDF |
|
10/30/1996 |
John D. Wagoner |
John T. Conway |
DOE Confirms Completion of Commitment 5.4.3.6a for the 93-5 Implementation Plan |
PDF |
|
10/21/1996 |
John D. Wagoner |
John T. Conway |
DOE Reports Completion of 93-5 Implementation Plan Milestone 5.4.3.4.a. |
PDF |
|
10/21/1996 |
John D. Wagoner |
John T. Conway |
DOE Reports Completion of 93-5 Implementation Plan Milestone 5.4.3.4.b. |
PDF |
|
10/3/1996 |
John D. Wagoner |
John T. Conway |
DOE Completion of Milestone 5.4.3.5d for the 93-5 Implementation Plan |
PDF |
|
9/27/1996 |
John D. Wagoner |
John T. Conway |
DOE Completion of Milestone 3.4.3.5c for the 93-5 Implementation Plan |
PDF |
|
9/23/1996 |
John D. Wagoner |
John T. Conway |
DOE Reporting Completion of Milestone 5.4.3.2.a for the 93-5 Implementation Plan |
PDF |
|
9/4/1996 |
John T. Conway |
Hazel R. O'Leary |
Board Accepts the Revised 93-5 Implementation Plan and Closes Recommendation 90-7 |
PDF |
|
8/30/1996 |
John D. Wagoner |
John T. Conway |
DOE Information to Complete Milestone 5.4.3.1.b for the 93-5 Implementation Plan |
PDF |
|
8/19/1996 |
John D. Wagoner |
John T. Conway |
DOE Information (data) to Complete Milestone 5.4.3.5.B for the 93-5 Implementation Plan |
PDF |
|
7/31/1996 |
Alvin L. Alm |
John T. Conway |
DOE Response to the Board's Review of Hanford Tanks Safety Issues |
PDF |
|
7/19/1996 |
John D. Wagoner |
John T. Conway |
DOE Quarterly Report for (April - June 30, 1996) for the 93-5 Implementation Plan |
PDF |
|
7/11/1996 |
DNFSB |
DOE |
Update on Flammable Gas and Lightning Mitigation Issues for the Hanford Site High- Level Waste Tanks, June 25-26, 1996 |
PDF |
|
6/30/1996 |
John D. Wagoner |
John T. Conway |
DOE Completion of Milestone 5.4.3.5.a for the 93-5 Implementation Plan |
PDF |
|
6/30/1996 |
John D. Wagoner |
John T. Conway |
DOE Completion of Radiological Source Term Supporting Document |
PDF |
|
6/17/1996 |
Hazel R. O'Leary |
John T. Conway |
DOE Implementation Plan for Recommendation 1993-5 |
PDF |
|
6/17/1996 |
Hazel R. O'Leary |
John T. Conway |
DOE Revised Implementation Plan for Recommendation 93-5 |
PDF |
|
5/10/1996 |
George W. Cunningham |
Mark B. Whitaker, Jr. |
Trip Report - Safety Issues Associated With the Proposed Retrieval of High-Level Waste from Hanford Tank 241-C-106 |
PDF |
|
3/1/1996 |
Richard J. Guimond |
John T. Conway |
DOE re: Revision to Implementation Plan for Recommendation 93-5 |
PDF |
|
2/28/1996 |
John D. Wagoner |
John T. Conway |
DOE Commitment 1.10, Quarterly Report 93-5 Implementation Plan |
PDF |
|
1/11/1996 |
Hazel R. O'Leary |
John T. Conway |
DOE Reports Delay in Completion of the Sampling and Analysis of All Watch List Tanks, 93-5 Implementation Plan |
PDF |
|
1/8/1996 |
John D. Wagoner |
John T. Conway |
DOE Status of Commitments 1.5 and 1.23 for 93-5 |
PDF |
|
12/8/1995 |
John D. Wagoner |
John T. Conway |
DOE Letter of Response Regarding Tank Waste Remediation System Risk Acceptance Criteria Document per the 93-5 Implementation Plan |
PDF |
|
12/5/1995 |
John D. Wagoner |
John T. Conway |
DOE Quarterly Report per the 93-5 Implementation Plan |
PDF |
|
12/5/1995 |
John D. Wagoner |
John T. Conway |
DOE Forwards Update of the Tank Layer Model Rev. 1, Commitment 1.16 per the 93-5 Implementation Plan |
PDF |
|
12/5/1995 |
John D. Wagoner |
John T. Conway |
DOE Forwards the 1995 Monthly Report per the 93-5 Implementation Plan |
PDF |
|
12/5/1995 |
John D. Wagoner |
John T. Conway |
DOE Forwards Update of Tank Layer Model Manual per the 93-5 Implementation Plan |
PDF |
|
12/5/1995 |
John D. Wagoner |
John T. Conway |
DOE Forwards the September 1995 Monthly Report per the 93-5 Implementation Plan |
PDF |
|
10/24/1995 |
John T. Conway |
John Wagoner |
Board Letter Rejecting RLOO's "Tank Waste Remediation System Risk Acceptance Criteria [Rec. 93-5]." |
PDF |
|
10/20/1995 |
John D. Wagoner |
John T. Conway |
DOE Forwards Closure of Commitment 1.20 per the 93-5 Implementation Plan |
PDF |
|
9/29/1995 |
Mary F. Jarvis |
John T. Conway |
DOE Forwards Closure of Commitment 1.20, Jan 95 and Jan 95 B04 per the 93-5 Implementation Plan |
PDF |
|
9/29/1995 |
Mary F. Jarvis |
John T. Conway |
DOE Letter Closing Commitments 1.21.8 and 2.1 per the 93-5 Implementation Plan |
PDF |
|
9/29/1995 |
Mary F. Jarvis |
John T. Conway |
Closure of Defense Nuclear Facility Safety Board Recommendations 90-7.1, 90-7.2 and Clarification of Closure of 93-5.2.2 |
PDF |
|
9/29/1995 |
Jackson Kinzer |
John T. Conway |
DOE Letter Closing Commitments 1.21.07 per the 93-5 Implementation Plan |
PDF |
|
8/14/1995 |
George W. Cunningham |
Mark Whitaker |
Status of Hanford Site High-Level Waste Tank Characterization Program Technical Basis |
PDF |
|
8/2/1995 |
John T. Conway |
Hazel R. O'Leary |
Board Acknowledges Closure of Commitments 5.1 and 5.4 of the 93-5 Implementation Plan |
PDF |
|
7/11/1995 |
Hazel R. O'Leary |
John T. Conway |
DOE Requests Deletion of Unnecessary Commitments 5.1 and 5.4 from 93-5 Implementation Plan |
PDF |
|
5/10/1995 |
Leif Erickson |
John T. Conway |
DOE Forwards the Quarterly Report, Characterization Program January 1 - March 31, 1995, per the 93-5 Implementation Plan |
PDF |
|
4/26/1995 |
DNFSB |
DOE |
Trip Report - Review of Hanford Site High-Level Waste Tank Safety and Characterization, March 14-16, 1995 |
PDF |
|
4/10/1995 |
Hazel R. O'Leary |
John T. Conway |
DOE Forwards Response to Recommendation 93-5 |
PDF |
|
2/23/1995 |
John T. Conway |
Hazel R. O'Leary |
Board Regards Changes in Measures in Connection with Characterization of High Level Nuclear Waste in Buried Tanks at the Hanford Site |
PDF |
|
2/22/1995 |
Thomas P. Grumbly |
John T. Conway |
DOE Letter Regarding Slow Rate of MEeting Commitments under ther 93-5 Implementation Plan |
PDF |
|
12/29/1994 |
T. R. Sheridan |
John T. Conway |
DOE Characterization Program Monthly Report for November, 1994, for the 93-5 Implementation Plan |
PDF |
|
12/13/1994 |
John T. Conway |
Thomas P. Grumbly |
Trip Report - Review of Hanford Site High-Level Waste Tank Safety and Characterization, October 24-27, 1994 |
PDF |
|
12/1/1994 |
T. R. Sheridan |
John T. Conway |
DOE Characterization Program Monthly Report for September, 1994, for the 93-5 Implementation Plan |
PDF |
|
10/21/1994 |
George W. Cunningham |
Mark Whitaker |
Report on 93-5 Laboratory Support |
PDF |
|
9/29/1994 |
George W. Cunningham |
Mark Whitaker |
Trip Report - Review of Implementation of DNFSB Recommendation 93-5 at the Hanford Site, July 19-21, 1994 |
PDF |
|
8/22/1994 |
Thomas P. Grumbly |
John T. Conway |
DOE Quarterly Report for the 93-5 Implementation Plan |
PDF |
|
6/30/1994 |
T. R. Sheridan |
John T. Conway |
DOE Deliverable for Commitment 5.10 of the 93-5 Implementation Pan |
PDF |
|
6/30/1994 |
T. R. Sheridan |
John T. Conway |
DOE Deliverables to Satisfy Commitment 3.15 for the 93-5 Implementation Plan |
PDF |
|
6/30/1994 |
DOE |
DNFSB |
DOE Deliverable for Commitment 5.11 of the 93-5 Implementation Plan |
PDF |
|
6/30/1994 |
T. R. Sheridan |
John T. Conway |
DOE a Review of the Characterization Field Procedures as Part of Commitment 3.2 for the 93-5 Implementation Plan |
PDF |
|
6/27/1994 |
T. R. Sheridan |
John T. Conway |
DOE Milestone Status Report and Schedule for Outstanding Deliverables for the 93-5 Implementation Plan |
PDF |
|
6/24/1994 |
John T. Conway |
Thomas P. Grumbly |
Board re: Characterization Program Quarterly Report for the 93-5 Implementation Plan |
PDF |
|
6/23/1994 |
T. R. Sheridan |
John T. Conway |
DOE Customer Needs Analysis to Satisfy Commitment 6.1 of 93-5 Implementation Plan |
PDF |
|
6/6/1994 |
Thomas P. Grumbly |
John T. Conway |
DOE Characterization Program Quarterly Report for the 93-5 Implementation Plan |
PDF |
|
6/6/1994 |
DNFSB |
DOE |
Trip Report - Review of Implementation of DNFSB Recommendation 93-5 at the Hanford Site, May 17-19, 1994 |
PDF |
|
5/26/1994 |
T. R. Sheridan |
John T. Conway |
DOE Completion of Commitment 1.3 of the 93-5 Implementation Plan |
PDF |
|
5/11/1994 |
John T. Conway |
Thomas P. Grumbly |
Board Review of the Hanford Site under Recommedation 93-5 |
PDF |
|
3/25/1994 |
John T. Conway |
Hazel R. O'Leary |
Board Acknowledges Receipt of the 93-5 Implementation Plan |
PDF |
|
3/9/1994 |
Hazel R. O'Leary |
John T. Conway |
DOE Forwards Annual Report for Calendar Year 1993 |
PDF |
|
2/23/1994 |
Thomas P. Grumbly |
John T. Conway |
DOE 93-5 Implementation Plan, Which Incorporates Final Comments and Corrections |
PDF |
|
1/21/1994 |
Hazel R. O'Leary |
John T. Conway |
DOE Forwards the Recommendation 93-5 Implementation Plan |
PDF |
|
12/9/1993 |
Hazel R. O'Leary |
John T. Conway |
DOE Requests 45-Day Extension to Prepare the 93-5 Implementation Plan |
PDF |
|
8/31/1993 |
Hazel R. O'Leary |
John T. Conway |
DOE Accepts Recommendation 93-5 |
PDF |
|
11/2/1992 |
T. R. Sheridan |
John T. Conway |
DOE Characterization Program Quarterly Report for the 93-5 Implementation Plan |
PDF |