May 3, 2004 |
Briefing on "Safety Basis Academy" Proposed for Establishment at Los Alamos National Laboratory |
Letter |
PDF |
April 30, 2004 |
DOE Request for a 90 Day Extension to Submit Report Regarding Conduct of Engineering and Implementation of DOE Order 420.1A, Facility Safety, at Los Alamos National Laboratory |
Letter |
PDF |
March 18, 2004 |
DOE Lightning Protection System at the Weapons Engineering Tritium Facility and Safety Classification of the Electrical Distribution System at the Chemistry and Metallurgy Research Facility |
Letter |
PDF |
March 9, 2004 |
DOE Status of Los Alamos National Laboratory's Portion of Commitment 4.6.1 in Implementation Plan 2002-3 |
Letter |
PDF |
February 23, 2004 |
DOE Status of Los Alamos National Laboratory Projects |
Letter |
PDF |
January 21, 2004 |
DOE Completion of Commitment 506 in Implementation Plan for Recommendation 2000-1 |
Letter |
PDF |
November 5, 2003 |
Board Denies Request by NNSA for Extension to Reporting Requirement on Defensible Lightning Protection at Los Alamos National Laboratory |
Letter |
PDF |
October 10, 2003 |
DOE Reports that an Additional 30 Days is needed to Respond to Board Reporting Requirement Regarding Lightning Protection Issues at the Weapons Evaluation Test Facily and Safety System Functional Classification Issues |
Letter |
PDF |
May 21, 2003 |
DOE Responds to Board Reporting Requirement Dated March 7, 2003 Regarding Flood Mitigation at Technical Area 18 after the Cerro Grande Fire |
Letter |
PDF |
May 12, 2003 |
Board Request for Briefing on the Results of the DynEx Project Review of Control Hazards and Facility Utilization at Los Alamos National Laboratory |
Letter |
PDF |