September 26, 2006 |
Surface Settlement Profiles for the Pit Disassembly and Conversion Facility (PDCF) at the Savannah River Site |
Letter |
PDF |
October 13, 2006 |
Savannah River Operations Office has Completed its Final Commitment Associated with the Implementation Plan (IP) for Board Recommendation 2000-1 |
Letter |
PDF |
December 4, 2006 |
DOE Program Evaluation: Board Recommendation 2001-1 Implementation Plan Commitment 3.11 |
Letter |
PDF |
February 1, 2007 |
Interim Status of DOE's High Level Waste Management at the Savannah River Site |
Letter |
PDF |
February 9, 2007 |
DOE Provides a Report on the Geotechnical and Structural Design of the Salt Waste Processing Facility at the Savannah River Site |
Letter |
PDF |
April 24, 2007 |
DOE Provides Status of and Plan to Complete Commitment 2.9 in the 2001-1 Implementation Plan |
Letter |
|
May 11, 2007 |
DOE Letter Regarding Structural Analysis and Design of the Salt Waste Processing Facility (SWPF) |
Letter |
PDF |
June 1, 2007 |
Actions Taken by DOE and Its Contractors to Resolve Safety Issues Relative to the Design of the Salt Waste Processing Facility at the Savannah River Site |
Letter |
PDF |
June 29, 2007 |
DOE Informs the Board of a Delay in the Issuance of the Savannah River Site Waste Disposition System Plan Relative to Commitment 3.11 in the 2001-1 Implementation Plan |
Letter |
PDF |
August 13, 2007 |
DOE Provides Status on the Savannah River Site Life-Cycle Liquid Waste Disposition System Plan |
Letter |
PDF |