October 13, 2011 |
Board Believes It Is Vital that the Secretary Assert Federal Control at the Highest Level and Direct, Track, and Validate Corrective Actions to Be Taken to Establish a Strong Safety Culture within the Waste Treatment and Immobilization Plant |
Letter |
PDF |
October 13, 2011 |
Board Thanks Dr. Caren Wenner, Dr. Courtney Dornburg and Randy Castillo for Presenting and Arranging a One-Day Short Course in Human Factors Engineering (HFE) for Board Technical Staff on September 15, 2011 |
Letter |
PDF |
October 5, 2011 |
DOE Letter Providing a Report Dated September 29, 2011, Describing Planned Actions to Address Issues with the System for Analysis of Soil-Structure Interaction (SASSI) Computer Code |
Letter |
PDF |
September 30, 2011 |
DOE Approval of the Documented Safety Analysis (DSA) for the Hanford Tank Farms is Now Projected for the End of November 2011 Instead of the End of September 2011 as Previously Communicated via DOE July 25, 2011, Letter to Board |
Letter |
PDF |
September 30, 2011 |
DOE Response to Board's August 3, 2011, Letter which Issued a Reporting Requirement, Citing a 45-Day Delay Until November 14, 2011, for the Requested Report on Pretreatment Facility Process Vessels at WTP, Hanford Site |
Letter |
PDF |
September 29, 2011 |
DOE Letter Informing the Board that the DOE Will Require Until November 15, 2011, to Complete Deliverable 5.2.3 of the Implementation Plan (IP) for Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety |
Letter |
PDF |
September 28, 2011 |
DOE Response to Board Letter Dated March 30, 2011, Concerning Washington River Protection Solutions, LLC, Improvements in Conduct of Operations |
Letter |
PDF |
September 26, 2011 |
DOE Letter Forwarding the Implementation Plan for the Board's Recommendation 2010-1, Safety Analysis Requirements for Defining Adequate Protection for the Public and the Workers |
Letter |
PDF |
September 23, 2011 |
DOE Letter Informing the Board that DOE is Taking an Extension of 45 days to Prepare the Implementation Plan for Board Recommendation 2010-2, Pulse Jet Mixing at the Waste Treatment and Immobilization Plant |
Letter |
PDF |
September 19, 2011 |
DOE Response to Board August 12, 2011, Letter Requesting Clarification on Four Areas Identified in the Original June 30, 2011, Response to Recommendation 2011-1 |
Letter |
PDF |