January 28, 2016 |
DOE letter proposing a delay in providing quarterly briefings to the Board on the Radioassay and Nondestructive Testing Facility at LANL |
Letter |
PDF |
January 7, 2016 |
LANL Emergency Preparedness and Response Observations |
Letter |
PDF |
September 30, 2015 |
Los Alamos National Laboratory Plutonium Facility Seismic Safety |
Letter |
PDF |
September 21, 2015 |
Opportunities for Risk Reduction at the Los Alamos National Laboratory Plutonium Facility through the Minimization of Material-at-Risk |
Letter |
PDF |
August 18, 2015 |
DOE letter informing the Board of the next steps to improve the seismic performance of the Plutonium Facility (PF-4) at the Los Alamos National Laboratory |
Letter |
PDF |
March 25, 2015 |
DOE letter responding to 12/9/2014 Board letter requesting a report and briefing on the NNSA path forward for resolution of issues identified for the Los Alamos (RANT) Shipping Facility Documented Safety Analysis (DSA)... |
Letter |
PDF |
February 13, 2015 |
DOE letter responding to 12/17/2014 Board letter requesting an updated plan and schedule for completing the alternate seismic analysis for the Los Alamos National Laboratory (LANL) Plutonium Facility (PF-4) |
Letter |
PDF |
December 17, 2014 |
PF-4 Alternate Seismic Analysis |
Letter |
PDF |
September 5, 2014 |
DOE NNSA letter with a list that provides the current plans for resumption of the remaining Los Alamos National Laboratory Plutonium Facility (PF-4) processes |
Letter |
PDF |
August 7, 2014 |
Board letter Concerning the Transuranic Waste Facility Critical Decision 3 Project |
Letter |
PDF |