Letters

Datesort ascending Title Document Type Document
January 28, 2016 DOE letter proposing a delay in providing quarterly briefings to the Board on the Radioassay and Nondestructive Testing Facility at LANL Letter PDF iconPDF
January 7, 2016 LANL Emergency Preparedness and Response Observations Letter PDF iconPDF
September 30, 2015 Los Alamos National Laboratory Plutonium Facility Seismic Safety Letter PDF iconPDF
September 21, 2015 Opportunities for Risk Reduction at the Los Alamos National Laboratory Plutonium Facility through the Minimization of Material-at-Risk Letter PDF iconPDF
August 18, 2015 DOE letter informing the Board of the next steps to improve the seismic performance of the Plutonium Facility (PF-4) at the Los Alamos National Laboratory Letter PDF iconPDF
March 25, 2015 DOE letter responding to 12/9/2014 Board letter requesting a report and briefing on the NNSA path forward for resolution of issues identified for the Los Alamos (RANT) Shipping Facility Documented Safety Analysis (DSA)... Letter PDF iconPDF
February 13, 2015 DOE letter responding to 12/17/2014 Board letter requesting an updated plan and schedule for completing the alternate seismic analysis for the Los Alamos National Laboratory (LANL) Plutonium Facility (PF-4) Letter PDF iconPDF
December 17, 2014 PF-4 Alternate Seismic Analysis Letter PDF iconPDF
September 5, 2014 DOE NNSA letter with a list that provides the current plans for resumption of the remaining Los Alamos National Laboratory Plutonium Facility (PF-4) processes Letter PDF iconPDF
August 7, 2014 Board letter Concerning the Transuranic Waste Facility Critical Decision 3 Project Letter PDF iconPDF

Pages