July 9, 2009 DOE Response to Board Letter Dated March 5, 2009, Regarding the Savannah River Tank 48 Treatment Project Letter PDF iconPDF
June 24, 2009 DOE Request for a 90-day Extension to Respond to Board's March 31, 2009, Request for Revision to the 2001-1 Implementation Plan Letter PDF iconPDF
June 3, 2009 Congratulations to Mr. Stanley Watkins on receiving the 2008 DOE Facility Representative of the Year Award Letter PDF iconPDF
March 31, 2009 Board Issues a Reporting Requirement for a Report from DOE within 90 Days for a Revised Implementation Plan on Proposed Dates for Outstanding Commitments for Recommendation 2001-1 Letter PDF iconPDF
March 24, 2009 DOE Response to Board February 10, 2009, Letter Regarding Open Issues at the Salt Waste Processing Facility Letter PDF iconPDF
March 5, 2009 Board Concerns on Design Activities and Associated Safety Basis Development for the Tank 48 Fluidized Bed Steam Reforming (FBSR) Project at the Savannah River Site Letter PDF iconPDF
February 10, 2009 Board Concerns on Final Design Activities and Safety Basis Development for the Salt Waste Processing Facility (SWPF) at the Savannah River Site Letter PDF iconPDF
January 12, 2009 Waste Solidification Building Project Summary, Savannah River Site Letter PDF iconPDF
October 8, 2008 DOE Request for 30 Day Extension for Briefing to Board Concerning Savannah River Site, re: Board Letter of September 4, 2008 Letter PDF iconPDF
September 22, 2008 DOE Letter Responding to the Board's Correspondence Dated June 25, 2008, Concerning the Structural and Geotechnical Design of the Waste Solidification Building at the Savannah River Site Letter PDF iconPDF