May 9, 2008 |
DOE has Completed Commitments 2.10 and 2.13 of the Implementation Plan for Recommendation 2001-1, High-Level Waste Management at the Savannah River Site |
Letter |
PDF |
March 28, 2008 |
DOE Request that the Board Provide a Narrow Technical Review of the Mixed Oxide Fuel Fabrication Facility Aqueous Processing Design with Respect to Whether the Intent of the Findings and Recommendations of DNFSB/TECH-33 have been Adequately Incorporated |
Letter |
PDF |
February 29, 2008 |
DOE Notice of Completion of Recommendation 2001-1 Commitment 2.9, Demonstrate the Viability of the Deliquification, Dissolution, and Adjustment of Implementation Plan |
Letter |
PDF |
January 2, 2008 |
DOE Notes Board's Belief that there is a Reasonable Assurance of Safety in Storing Aluminum-Rich Supernate in Tank 11, Provided Certain Actions are Performed |
Letter |
PDF |
October 26, 2007 |
DOE Letter Regarding the Savannah River Site Life-Cycle Liquid Waste Disposition System Plan, Revision 14 |
Letter |
PDF |
October 24, 2007 |
DOE Letter Regarding Commitments 2.9, 2.10, and 2.13 for the DOE's Implementation Plan for Board Recommendations 2001-1, High-Level Waste Management at the Savannah River Site |
Letter |
PDF |
August 29, 2007 |
Board Letter Regarding DOE's Plans for Low-Temperature Aluminum Dissolution and Subsequent Storage of Aluminum-Rich Supernate in Tank 11 at the Savannah River Site's High-Level Waste Tank Farms |
Letter |
PDF |
August 16, 2007 |
DOE Letter Regarding Aluminum Removal from Sludge Batch 5 in Tank 51 at the Savannah River Site |
Letter |
PDF |
August 13, 2007 |
DOE Provides Status on the Savannah River Site Life-Cycle Liquid Waste Disposition System Plan |
Letter |
PDF |
June 29, 2007 |
DOE Informs the Board of a Delay in the Issuance of the Savannah River Site Waste Disposition System Plan Relative to Commitment 3.11 in the 2001-1 Implementation Plan |
Letter |
PDF |