Letters

Datesort descending Title Document Type Document
August 16, 2007 DOE Letter Regarding Aluminum Removal from Sludge Batch 5 in Tank 51 at the Savannah River Site Letter PDF iconPDF
August 29, 2007 Board Letter Regarding DOE's Plans for Low-Temperature Aluminum Dissolution and Subsequent Storage of Aluminum-Rich Supernate in Tank 11 at the Savannah River Site's High-Level Waste Tank Farms Letter PDF iconPDF
October 24, 2007 DOE Letter Regarding Commitments 2.9, 2.10, and 2.13 for the DOE's Implementation Plan for Board Recommendations 2001-1, High-Level Waste Management at the Savannah River Site Letter PDF iconPDF
October 26, 2007 DOE Letter Regarding the Savannah River Site Life-Cycle Liquid Waste Disposition System Plan, Revision 14 Letter PDF iconPDF
January 2, 2008 DOE Notes Board's Belief that there is a Reasonable Assurance of Safety in Storing Aluminum-Rich Supernate in Tank 11, Provided Certain Actions are Performed Letter PDF iconPDF
February 29, 2008 DOE Notice of Completion of Recommendation 2001-1 Commitment 2.9, Demonstrate the Viability of the Deliquification, Dissolution, and Adjustment of Implementation Plan Letter PDF iconPDF
March 28, 2008 DOE Request that the Board Provide a Narrow Technical Review of the Mixed Oxide Fuel Fabrication Facility Aqueous Processing Design with Respect to Whether the Intent of the Findings and Recommendations of DNFSB/TECH-33 have been Adequately Incorporated Letter PDF iconPDF
May 9, 2008 DOE has Completed Commitments 2.10 and 2.13 of the Implementation Plan for Recommendation 2001-1, High-Level Waste Management at the Savannah River Site Letter PDF iconPDF
September 22, 2008 DOE Letter Responding to the Board's Correspondence Dated June 25, 2008, Concerning the Structural and Geotechnical Design of the Waste Solidification Building at the Savannah River Site Letter PDF iconPDF
October 8, 2008 DOE Request for 30 Day Extension for Briefing to Board Concerning Savannah River Site, re: Board Letter of September 4, 2008 Letter PDF iconPDF

Pages