December 20, 2002 |
DOE Project Plan for the Disposition of the Savannah River Site Depleted, Natural, and Low-Enriched Uranium Materials |
Letter |
PDF |
December 19, 2002 |
National Nuclear Security Administration’s Responses to Issues Raised by the Board during the Design of the Tritium Extraction Facility at the Savannah River Site |
Letter |
PDF |
November 18, 2002 |
DOE Compilation of Responses on Issues Regarding the Tritium Extraction Facility Project at the Savannah River Site |
Letter |
PDF |
November 8, 2002 |
Board Does Not Believe Conditions for Certification of Section 3137 of the National Defense Authorization Act for Fiscal Year 2001 Have Been Met |
Letter |
PDF |
November 1, 2002 |
DOE Performance Incentives at the Savannah River Site |
Letter |
PDF |
November 1, 2002 |
DOE Regarding the Old HB-Line Ventilation System in the Savannah River Site H-Canyon |
Letter |
PDF |
October 21, 2002 |
DOE Report on Savannah River Site's High Level Waste Tank 48-H Disposition Alternatives Identification Phase 1 & 2 Relative to the 2001-1 Implementation Plan |
Letter |
PDF |
October 17, 2002 |
DOE Worker Protection in the Tritium Extraction Facility at the Savannah River Site |
Letter |
PDF |
October 1, 2002 |
DOE Responding to Board Reporting Requirement on High-Level Waste Activities at the Savannah River Site and Alternative Technologies for the Removal of Cesium from Salt Waste |
Letter |
PDF |
September 30, 2002 |
DOE Dispositon of Depleted Uranium Materials at the Savannah River Site |
Letter |
PDF |