Letters

Datesort ascending Title Document Type Document
April 4, 2006 DOE Plan for Returning the Savannah River Site's Tank 48 to Active Waste Service and a Technical Report on the Proposed Allowable Organic Residuals in the Tank Letter PDF iconPDF
April 4, 2006 DOE Plan for Returning the Savannah River Site's Tank 48 to Active Waste Service and a Technical Report on the Proposed Allowable Organic Residuals in the Tank Letter PDF iconPDF
January 17, 2006 DOE Revised Implementation Plan Relative to the Board's Recommendation 2001-1, High-Level Waste Management at the Savannah River Site Letter PDF iconPDF
November 23, 2005 DOE Regards Design Approach for Providing Performance Category 3(PC-3) Confinement for the Salt Waste Processing Facility (SWPF) Letter PDF iconPDF
November 18, 2005 DOE Provides Status of Two Environmental Management Commitments, Disposition of Low-Curie Salt to the Saltstone Facility and Start of the Actinide Removal Process Relative to the Disposition of Tank Waste at the Savannah River Letter PDF iconPDF
July 11, 2005 DOE Letter to the United States Congress Forwarding the Second Annual Report to Congress on Plutonium Storage at the Savannah River Site Letter PDF iconPDF
June 10, 2005 Board Letter Forwarding Its Second Annual Report to Congress on Plutonium Storage at the DOEs Savannah River Site Letter PDF iconPDF
December 14, 2004 Board Issues a Reporting Requirement for a Briefing from DOE within 30 Days Providing a Factual Review of Waste Drum Issues at Savannah River Site Letter PDF iconPDF
December 14, 2004 DOE Natural Phenomena Hazards Design Standards and the Salt Waste Processing Facility at the Savannah River Site Letter PDF iconPDF
October 13, 2004 DOE Seismic Design of the Salt Waste Processing Facility at the Savannah River Site and DOE Directives on Natural Phenomena Hazards Letter PDF iconPDF

Pages