August 28, 1996 |
Handling of Spent Nuclear Fuel at the Idaho National Engineering Laboratory (INEL), Trip Report for August 19-23, 1996. |
Staff Issue Report |
PDF |
June 28, 1996 |
Advanced Test Reactor Design Review |
Staff Issue Report |
PDF |
May 22, 1996 |
Review of Phase II of the Department of Energy's Operational Readiness Review of High-Level Liquid Waste Evaporator at the Idaho Chemical Processing Plant, Idaho National Engineering Laboratory, April 29 - May 2, 1996. |
Staff Issue Report |
PDF |
April 19, 1996 |
Review of the Department of Energy's Operational Readiness Review of High-Level Liquid Waste Evaporator at the Idaho Chemical Processing Plant, Idaho National Engineering Laboratory, April 1-4, 1996 |
Staff Issue Report |
PDF |
September 28, 1995 |
Review of Spent Nuclear Fuel Activities at Idaho National Engineering Laboratory |
Staff Issue Report |
PDF |
September 19, 1995 |
Chemical Processing and Safety Basis at the New Waste Calcining Facility, Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Report of Site Visit, August 29-31, 1995 |
Staff Issue Report |
PDF |
August 29, 1995 |
Idaho National Engineering Laboratory - Idaho Chemical Processing Plant - Trip Report (August 8-10, 1995) |
Staff Issue Report |
PDF |
July 25, 1995 |
Tank Farm Radiological Protection, Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Report of Site Visit, June 27-29, 1995 |
Staff Issue Report |
PDF |
May 23, 1995 |
Safety Analyses and Thermal-Hydraulic Performance, Advanced Test Reactor, Idaho National Engineering Laboratory, Report of Site Visit, May 2-4, 1995 |
Staff Issue Report |
PDF |
May 2, 1995 |
Fuel Transfers and the New Waste Calcining Facility, Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Report of Site Visit, March 28-30, 1995 |
Staff Issue Report |
PDF |